NIST WTC Recommendations 4-7 > Structural Fire Endurance

First Post in This Series …

2011-10-25:  NIST’s Recommendations on the 9-11 WTC Building Collapses … GROUP 1. Increased Structural Integrity – Recommendations 1, 2 & 3 (out of 30)

.

2011-11-18:  SOME PRELIMINARY COMMENTS …

  1.     Before launching into the next Group of NIST WTC Recommendations, it would be useful to distinguish between the following technical terms … which have been adapted from ISO/TR 10158: ‘Principles and Rationale Underlying Calculation Methods in Relation to Fire Resistance of Structural Elements’

Real Fire:  A fire which develops in a building and which is influenced by such factors as the type of building and its occupancy;  the combustible content (fire load);  the ventilation, geometry and thermal properties of the fire compartment, or building space (should no fire compartmentation exist);  the fire suppression systems in the building and the actions of the fire services.

Real Fires are complex phenomena.  Consequently, in structural fire engineering, idealized versions of ‘real fires’ are employed.

Experimental Fire:  A full or reduced scale fire with specified and controlled characteristics.

Design Fire:  A fire with specified exposure data intended for use in connection with structural fire engineering calculations.

A Design Fire may either be representative of the thermal exposure described by the standard time-temperature-pressure relationship in an International/European/National Standard, or some non-standard exposure intended to simulate particular fire exposure conditions.

However, in SDI Technical Guidance Note 95/102: ‘Proper Evidence of a Fire Test Result within the European Economic Area (EEA)’, issued on 22 May 1995, I included the following caution …

#1.7  A Fire Test in a Fire Test Laboratory, involving exposure of a test specimen or prototype to ‘test fire’ conditions, gives only a limited indication of:  (a) the likely performance of a particular product, material or component when exposed to ‘real fire’ conditions;  and (b) the suitability of a product, material or component for a particular end use.

  2.     In conventional fire engineering, much confusion arises because of a failure to properly distinguish between these two concepts …

Fire Resistance

The inherent capability of a building assembly, or an ‘element of construction’, to resist the passage of heat, smoke and flame for a specified time during a fire.

Structural Reliability

The ability of a structural system to fulfil its design purpose, for a specified time, under the actual environmental conditions encountered in a building.

[ In structural fire engineering, the concern must be that the structure will fulfil its purpose, both during the fire – and for a minimum period afterwards, during the ‘cooling phase’.]

  3.     Therefore, with regard to Recommendation 6 … it is more correct and precise to refer to ‘Steel Fire Protection Systems’, rather than to ‘steel fire resisting materials’ !   AND … the same questions must be asked about All Lightweight Steel Fire Protection Systems … not just the sprayed systems.

Lightweight Fire Protection Systems are also used to protect concrete in buildings and tunnels.

  4.     These 2005 NIST Recommendations will later be confirmed, and further reinforced, by the 2008 NIST Recommendations.  Bringing Recommendation 7, below, closer to home … it is interesting to note that a very necessary discussion on the technical adequacy of the approach taken to structural performance in fire … in both Technical Guidance Document B (Ireland) and Approved Document B (England & Wales) … has yet not even commenced !

.

2005 NIST WTC RECOMMENDATIONS

GROUP 2.  Enhanced Fire Endurance of Structures

The procedures and practices used to ensure the fire endurance of structures should be enhanced by improving the technical basis for construction classifications and fire resistance ratings, improving the technical basis for standard fire resistance testing methods, use of the ‘structural frame’ approach to fire resistance ratings, and developing in-service performance requirements and conformance criteria for sprayed fire resisting materials.

NIST WTC Recommendation 4.

NIST recommends evaluating, and where needed improving, the technical basis for determining appropriate construction classifications and fire rating requirements (especially for tall buildings) – and making related code changes now, as much as possible – by explicitly considering factors including: *

[ * F-23  The construction classification and fire rating requirements should be risk-consistent with respect to the design-basis hazards and the consequences of those hazards.  The fire rating requirements, which were originally developed based on experience with buildings less than 20 storeys in height, have generally decreased over the past 80 years since historical fire data for buildings suggest considerable conservatism in those requirements.  For tall buildings, the likely consequences of a given threat to an occupant on the upper floors are more severe than the consequences to an occupant on the first floor or the lower floors.  For example, with non-functioning elevators, both of the time requirements are much greater for full building evacuation from upper floors and emergency responder access to those floors.  It is not clear how the current height and areas tables in building codes consider the technical basis for the progressively increasing risk to an occupant on the upper floors of tall buildings that are much greater than 20 storeys in height.]

  • timely access by emergency responders and full evacuation of occupants, or the time required for burnout without partial collapse ;
  • the extent to which redundancy in active fire protection systems (sprinklers and standpipe, fire alarm, and smoke management) should be credited for occupant life safety ; *

[ * F-24  Occupant life safety, prevention of fire spread, and structural integrity are considered separate safety objectives.]

  • the need for redundancy in fire protection systems that are critical to structural integrity ; *

[ * F-25  The passive fire protection system (including fire protection insulation, compartmentation, and fire stopping) and the active sprinkler system each provide redundancy for maintaining structural integrity in a building fire, should one of the systems fail to perform its intended function.]

  • the ability of the structure and local floor systems to withstand a maximum credible fire scenario* without collapse, recognizing that sprinklers could be compromised, not operational, or non-existent ;

[ * F-26  A maximum credible fire scenario includes conditions that are severe, but reasonable to anticipate, conditions related to building construction, occupancy, fire loads, ignition sources, compartment geometry, fire control methods, etc., as well as adverse, but reasonable to anticipate operating conditions.]

  • compartmentation requirements (e.g. 1,200 sq.m *) to protect the structure, including fire rated doorsets and automatic enclosures, and limiting air supply (e.g. thermally resisting window assemblies) to retard fire spread in buildings with large, open floor plans ;

[ * F-27  Or a more appropriate limit, which represents a reasonable area for active fire fighting operations.]

  • the effect of spaces containing unusually large fuel concentrations for the expected occupancy of the building ;   and
  • the extent to which fire control systems, including suppression by automatic or manual means, should be credited as part of the prevention of fire spread.

Adoption of this Recommendation will allow building codes to distinguish the risks associated with different building heights, fuel concentrations, and fire protection systems.  Research is needed to develop the data and evaluate alternative proposals for construction classifications and fire ratings.  Model Building Codes:  A comprehensive review of current construction classifications and fire rating requirements and the establishment of a uniform set of revised thresholds with a firm technical basis that considers the factors identified above should be undertaken.*

[ * F-28  The National Fire Protection Association (NFPA) 5000 model code and the International Building Code (IBC) both recognize the risks associated with different building heights and accepted changes in 2001 and 2004, respectively.  Both model codes now require that buildings 126 metres and higher have a minimum 4 hour structural fire resistance rating.  The previous requirement was 2 hours.  The change provides increased fire resistance for the structural system leading to enhanced tenability of the structure and gives firefighters additional protection while fighting a fire.  While NIST supports these changes as an interim step, NIST believes that it is essential to complete a comprehensive review that will establish a firm technical basis for construction classifications and fire rating requirements.]

NIST WTC Recommendation 5.

NIST recommends that the technical basis for the century-old standard for fire resistance testing of components, assemblies and systems be improved through a national effort.  Necessary guidance also should be developed for extrapolating the results of tested assemblies to prototypical building systems.  A key step in fulfilling this Recommendation is to establish a capability for studying and testing components, assemblies, and systems under realistic fire and load conditions.

This effort should address the technical issues listed below: *

[ * F-29  The technical issues were identified from the series of four fire resistance tests of the WTC Floor system, and the review and analysis of relevant documents that were conducted as part of this Investigation.]

a.     Criteria and test methods for determining:

  • structural limit states, including failure, and means for measurement ;
  • effect of scale of test assembly versus prototype application, especially for long-span structures that significantly exceed the size of test furnaces ;
  • effect of restraining thermal expansion (end-restraint conditions) on test results, especially for long-span structures that have greater flexibility ;
  • fire resistance of structural connections, especially the fire protection required for a loaded connection to achieve a specified rating ; *

[ * F-30  There is a lack of test data on the fire resistance ratings of loaded connections.  The fire resistance of structural connections is not rated in current practice.  Also, standards and codes do not provide guidance on fire protection requirements for structural connections when the connected members have different fire resistance ratings.]

  • effect of the combination of loading and exposure (time-temperature profile) required to adequately represent expected conditions ;
  • the repeatability and reproducibility of test results (typically, results from a single test are used to determine the rating for a component or assembly) ;   and
  • realistic ratings for structural assemblies made with materials that have improved elevated temperature properties (strength, modulus, creep behaviour).

b.     Improved procedures and guidance to analyze and evaluate existing data from fire resistance tests of building components and assemblies for use in qualifying an untested building element.

c.     Relationships between prescriptive ratings and performance of the assembly in real fires.

Affected National and International Standards: * ASTM E 119, NFPA 251, UL 263, and ISO 834.  Model Building Codes:  The standards should be adopted in model building codes by mandatory reference to, or incorporation of, the latest edition of the standard.

[ * F-31  While the NIST Recommendations are focused mainly on U.S. national standards, each U.S. standard has counterpart international standards.  In a recent report (ISO/TMB AGS N 46), the International Organization for Standardization (ISO), through its Advisory Group for Security (AGS), has recommended that since many of the ISO standards for the design of buildings date back to the 1980’s, they should be reviewed and updated to make use of the studies done by NIST on the World Trade Center disaster, the applicability of new technology for rescue from high buildings, natural disasters, etc.  ISO’s Technical Advisory Group 8 co-ordinates standards work for buildings.]

NIST WTC Recommendation 6.

NIST recommends the development of criteria, test methods, and standards:  (1) for the in-service performance of Sprayed Fire Resisting Materials (SFRM, also commonly referred to as fire protection insulation) used to protect structural components;  and (2) to ensure that these materials, as installed, conform to conditions in tests used to establish the fire resistance rating of components, assemblies, and systems.

This should include:

  • Improved criteria and testing methodologies for the performance and durability of SFRM (e.g. adhesion, cohesion, abrasion, and impact resistance) under in-service exposure conditions (e.g. temperature, humidity, vibration, impact, with/without primer paint on steel*) for use in acceptance and quality control.  The current test method to measure the bond strength, for example, does not distinguish the cohesive strength from the tensile and shear adhesive strengths.  Nor does it consider the effect of primer paint on the steel surface.  Test requirements that explicitly consider the effects of abrasion, vibration, shock, and impact under normal service conditions are limited or do not exist.  Also, the effects of elevated temperatures on thermal properties and bond strength are not considered in evaluating the performance and durability of SFRM.

[ * F-32  NIST tests show that the adhesive strength of SFRM on steel coated with primer paint was a third to half of the adhesive strength on steel that had not been coated with primer paint.  The SFRM products used in the WTC towers were applied to steel components coated with primer paint.]

  • Inspection procedures, including measurement techniques and practical conformance criteria, for SFRM in both the building codes and fire codes for use after installation, renovation, or modification of all mechanical and electrical systems and by fire inspectors over the life of the building.  Existing standards of practice (AIA MasterSpec and AWCI Standard 12), often required by codes for some buildings need to be broadly applied to both new and existing buildings.  These standards may require improvements to address the issues identified in this Recommendation.
  • Criteria for determining the effective uniform SFRM thickness – thermally equivalent to the variable thickness of the product as it is actually applied – that can be used to ensure that the product in the field conforms to the near uniform thickness conditions in the tests used to establish the fire resistance rating of the component, assembly, or system.  Such criteria are needed to ensure that the SFRM, as installed, will provide the intended performance.
  • Methods for predicting the effectiveness of SFRM insulation as a function of its properties, the application characteristics, and the duration and intensity of the fire.
  • Methods for predicting service life performance of SFRM under in-service conditions.

Affected Standards:  AIA MasterSpec and AWCI Standard 12 for field inspection and conformance criteria; ASTM standards for SFRM performance criteria and test methods.  Model Building Codes:  The standards should be adopted in model building codes by mandatory reference to, or incorporation of, the latest edition of the standard.  (See Recommendation 10 for more on this issue.)

NIST WTC Recommendation 7.

NIST recommends the adoption and use of the ‘structural frame’ approach to fire resistance ratings.  This approach requires that structural members – such as girders, beams, trusses, and spandrels having direct connection to the columns, and bracing members designed to carry gravity loads – be fire protected to the same fire resistance rating as columns.  This approach is currently required by the International Building Code (IBC), one of the model codes, and is in the process of adoption by NFPA 5000, the other model code.  This requirement ensures consistency in the fire protection provided to all of the structural elements that contribute to overall structural stability.*  State and local jurisdictions should adopt and enforce this requirement.

[ * F-33  Had this requirement been adopted by the 1968 New York City building code, the WTC floor system, including its connections, would have had the 3 hour rating required for the columns since the floors braced the columns.]

.

.

END

Sustainable Fire Engineering – IABSE Lecture 1 December 2011

2011-11-14 …

On Thursday evening, 1st December 2011, at 19.00 hrs … in the Dublin Institute of Technology … I will present an IABSE-Ireland Sponsored Lecture on the subject: ‘Sustainable Fire Engineering IS THE FUTURE !’.

This Presentation has been in continuous development across a snaking international path … Dubayy (UAE) in 2008 … Lund (Sweden) and Bengaluru (India) in 2009 … Dilli (India), Zurich (Switzerland) and Dublin (Ireland) in 2010 … Paris (France), the IFE’s International Fire Conference in Cardiff (Wales) and the ASFP-Ireland Fire Seminar in 2011 … and on 1 December next, in Dublin, I will be introducing some tough new realities for fire engineering generally … not just in Ireland …

Colour photograph showing the impact of witnessing the 9-11 WTC Incident in New York. Sustainable Fire Engineering must be 'reliability-based' & 'person-centred'. But ... do building designers, including fire engineers, actually understand that the people who use their buildings are 'individuals' ... each having a different range of abilities ? Photograph by Marty Lederhandler/AP. Click to enlarge.
Colour photograph showing the impact of witnessing the 9-11 WTC Incident in New York. Sustainable Fire Engineering must be 'reliability-based' & 'person-centred'. But ... do building designers, including fire engineers, actually understand that the people who use their buildings are 'individuals' ... each having a different range of abilities ? Photograph by Marty Lederhandler/AP. Click to enlarge.

.

IABSE Irish National Group Sponsored Lecture

Dublin Institute of Technology, Bolton Street – Michael O’Donnell Room (259)

Thursday, 1 December 2011 @ 19.00 hrs / 7.00 p.m.

CJ Walsh: Sustainable Fire Engineering IS THE FUTURE !  (Lecture Flyer, PDF File, 259 kb)

.

The aim of Sustainable Fire Engineering is to realize a safe and sustainable built environment.

Responding ethically, in built and/or wrought form, to the still evolving concept of sustainable human and social development … a principal objective of Sustainable Fire Engineering is to design for maximum credible fire and user scenarios … in order to maintain a proper and satisfactory level of fire safety and protection over the full life cycle of, for example, a building … and for a Sustainable Building, that life cycle is 100 years minimum.

Sustainable Fire Engineering must, therefore, be ‘reliability-based’ & ‘person-centred’.

This presentation will examine the authentic language and meaning of sustainability … and will then track how this impacts on the professional practice of fire engineering.  Special mention will be made of Fire-Induced Progressive Collapse.

.

See you all there !   And I will be looking forward to a lot of challenging feedback on the night !!

.

.

END

Fixing ‘Priory Hall’ in Dublin – Practical Solutions Needed Now !

2011-10-18:  A large ‘can of worms’ has recently been opened in Ireland …

For the last few days, including today, I have been listening intently to Joe Duffy on the RTE Radio ‘Liveline’ Programme at lunchtime.  Joe is being very cautious because he cannot quite believe his ears … either about the unfolding harrowing events for occupants in ‘Priory Hall’, Donaghmede, Dublin 13 – a Private, Multi-Storey Apartment Development – or the tales and anecdotes about Irish Building Sites during the Celtic Tiger Years.

This will be of no consolation to anybody … but the big surprise, for me, is that there is so much public shock.  ‘Priory Hall’ is the Tip of the Iceberg !   Ireland’s current dysfunctional approach to the development of Our(!) Built Environment … has been designed (for want of a better word) in a chaotic, haphazard and malevolent way … to end up in exactly the sort of mess which we are all now witnessing in North County Dublin.

Just to be clear … what has been happening in the Irish Construction Industry, during the boom years, has been happening for twenty years all over the country … more precisely, since the introduction of Legal National Building Regulations, with NO Effective Building Control, in 1991 … and, before that again, in those parts of this jurisdiction, outside of the major urban areas having Legal Building Bye-Laws, and Effective Building Control, i.e. mandatory inspections by competent local authority personnel at the foundation level and drainage level of all building sites … and, depending on the type of project, occasional or frequent inspections above ground level.

[ 1991:  Statutory Instrument No.304 of 1991 – Building Control Act, 1990 (Commencement Order), 1991;  Statutory Instrument No.305 of 1991 – Building Control Regulations, 1991;  Statutory Instrument No.306 of 1991 – Building Regulations, 1991 ]

And the biggest joke of all … is that the sum of the many resources, both human and material, required to repair sub-standard construction throughout Ireland … will count as a positive contribution towards the economic indicator of GDP (Gross Domestic Product) !   FUBAR

.

Colour photograph showing 'Priory Hall' ... a private, multi-storey apartment development located in North County Dublin, Ireland. Click to enlarge.
Colour photograph showing 'Priory Hall' ... a private, multi-storey apartment development located in North County Dublin, Ireland. Click to enlarge.

.

PRACTICAL SOLUTIONS NEEDED NOW

What I have not been hearing from the radio, or reading in the newspapers, is practical solutions.

Lest there be any doubt … this is one of the professional services we provide at Sustainable Design International !

So … how do we fix Priory Hall as the situation now presents itself … in such a way that, as soon as it is practicable, a satisfactory level of long-term safety, protection, convenience and comfort will be provided for the occupants of Priory Hall … and the social wellbeing of the local community, there, can be restored.

Afterwards … we can worry about who’s responsible, and about the reasons for the many ‘system’ failures in Ireland.

.

FIXING ‘PRIORY HALL’ IN DUBLIN

The following list of practical suggestions … a simple roadmap … is addressed to the Owners and Occupants of Apartments in Priory Hall.

As they have a large vested interest in the problems of Priory Hall … either directly or indirectly … no assurances or undertakings should be accepted, on face value, from either Dublin City Council (DCC) or the Department of the Environment, Community & Local Government (DECLG) … or their representatives.

     1.  Informed Consent of Apartment Owners and Occupants

Demand that the Informed Consent of the Owner/Occupant of an Apartment is required, in writing, before any necessary Corrective/Repair/Refurbishment Works are carried out …

Informed Consent:  Consent freely obtained – without threats or improper inducements – after appropriate disclosure to a person of relevant, adequate and easily assimilated information in a form and language understood by that person.

     2.  ‘As Constructed’ Drawings & Specification of Entire Development

If they exist … we’re on the way !   But, if they don’t exist … and they may not … demand that an ‘As Constructed’ Survey of the Entire Development be carried out immediately.

Demand to see a copy of the Detailed ‘As Constructed’ Drawings, and Specification, for the Entire Development.

CHECK the adequacy of the Detailed Drawings and Specification !

At this stage, remember … all of the emphasis must now be placed on actual construction … not on paperwork !   The ‘As Constructed’ Survey Drawings and Specification are only a means towards a satisfactory end … that’s all !!

     3.  Failures to Properly Comply with Current Building Regulation Requirements A to M (Second Schedule to Irish Building Regulations)

Demand to see a Detailed Schedule of the many failures to properly comply with current Building Regulation Requirements, i.e. Parts A to M in the Second Schedule to the Building Regulations, as amended.

Do not entertain, even for a moment, any discussion about past legal building regulation requirements, which were in force at the time of initial design or construction !

An important point to note !   The Guidance Texts in, for example, Technical Guidance Document B: ‘Fire Safety’ are merely that … GUIDANCE !   This guidance is not infallible … and in a few respects, is entirely inadequate … for example, when dealing with the structural performance of buildings during conditions of fire, and the ‘cooling phase’ immediately afterwards … and the fire evacuation of people with activity limitations, in which case the guidance actually ensures that fire evacuation is made extremely difficult, if not prevented altogether !

Do not be sucked in to any conversations about what is stated, or not stated, in the Technical Guidance Documents.  This is irrelevant.  The Law mandates proper compliance with the Requirements !

Some people may even attempt to quote from the Building Regulation Approved Documents for England & Wales.  Just tell them to take a long jump off a short pier … suggest Howth Harbour !

Become very, very suspicious whenever there is a use of, or reference to, the term ‘Substantial Compliance’ !!

CHECK the adequacy of this Detailed Schedule !   And … ensure that it is Comprehensive !!

     4.  The Necessary Corrective/Repair/Refurbishment Works

Demand to see Full Detailed Information, in the form of annotated drawings and descriptive texts, etc., etc … on the exact nature, timetable and phasing of all of the Corrective/Repair/Refurbishment Works which are necessary to effectively solve the serious problems in the Development.

Beware of decorative solutions, which look good to a superficial visual inspection in ambient conditions … but don’t actually solve anything !

CHECK the adequacy of this Full Detailed Information !

     5.  Independent Technical Control of Construction Works

Demand only Category A Construction Execution of the necessary Corrective/Repair/Refurbishment Works …

Category A Construction Execution:

(a)  Supervision of the works is exercised by appropriately qualified and experienced personnel from the principal construction organization ;

(b)  Regular inspections, by appropriately qualified and experienced personnel familiar with the design and independent of the construction organization(s) … and other vested interests … are carried out to verify that the works are being executed in accordance with the design.

Demand receipt of a clear undertaking, in writing, that this will be the case … before any Corrective/Repair/Refurbishment Works commence.

And remember these words from the 2005 Final Report of the U.S. National Institute of Standards & Technology (NIST) on the 9-11 World Trade Center Tower Collapses …

” NIST urges state and local agencies to rigorously enforce building codes and standards since such enforcement is critical to ensure the expected level of safety.  Unless they are complied with, the best codes and standards cannot protect occupants, emergency responders, or buildings.”

CHECK the adequacy of the Proposed Method of Independent Technical Control during execution of the Corrective/Repair/Refurbishment Works !

     6.  Meeting & Discussion with Other Owners/Occupants

Do not act alone … meet the other Owners/Occupants, and discuss issues with them.  Share and collate all available information together.  Try to identify information gaps.  If you do not understand something … ask !

When, and only when, you are happy … signal your Informed Consent that works should commence.

     7.  Commencement of Corrective/Repair/Refurbishment Works

Visit the Construction Site Office regularly … to show that you are taking a keen interest in what is happening.  Keep your eyes and ears wide open.

Expect that you will not be permitted to just wander around the Site.  Construction Sites are one of the most hazardous ‘workplaces’ in this country !

CHECK the adequacy of the Independent Technical Control actually being undertaken.

Demand to be updated, regularly, and at the very least on the progress of Corrective/Repair/Refurbishment Works at your Apartment … in the Common Areas of your Block … and throughout the full extent of the Approach Routes to your Block Entrances and Exits.

.

.

Advisory Note:  Should you, or the Residents’ Committee of your Building or Development, be concerned about any matter discussed in this Post … please contact C.J. Walsh  by e-mail: cjwalsh@sustainable-design.ie  or by phone: (01) 8386078 / +353 1 8386078.

.

.

END  (for now, but to be continued soon !)

Remembering Dr. Ernesto ‘EL CHE’ Guevara de la Serna Lynch

Update 2020-04-07:  ‘El Che’ Memorial Stamp – Issued by An Post, Ireland.  2017.

Colour photograph of the ‘El Che’ Memorial Stamp, issued by An Post (Ireland’s National Postal Service), in October 2017 … to commemorate the 50th Anniversary of Che Guevara’s Assassination by United States/CIA and Bolivian Soldiers in the remote village of La Higuera, Bolivia.  This iconic image of Che is based on a Jim Fitzpatrick Poster which, in turn, was based on a 1960 Photograph* taken by Alberto Korda (Alberto Díaz Gutiérrez).  Photograph of stamp by CJ Walsh.  2020-04-07.  Click to enlarge.

* On Friday, 4 March, 1960, a ship exploded in Havana Harbour, killing more than a hundred workers and injuring many more, including passers-by who rushed to offer help.  The vessel ‘La Coubre’ was loaded with tonnes of weapons which had been bought in Belgium by the Cuban Government and secretly transported to the Caribbean.

.

Korda would later recall his magical ‘Che’ shutter experience: “At the foot of a podium decorated in mourning after the tragic explosion, I had my eye to the viewfinder of my old Leica Camera.  I was focusing on Fidel and the people around him.  Suddenly, through the 90mm lens, Che emerged above me.  I was surprised by his gaze.  By sheer reflex I shot twice, horizontally and vertically.  I didn’t have time to take a third photo as Che stepped back discreetly into the second row.  It all happened in a few seconds.”

Korda called this image ‘Guerrillero Heroico’ ; the Che who appeared in it was a human being who was shocked and angry (at such a brazen attack by the United States/CIA in the heart of Havana, so damaging to the Revolution) and mournful (after so many deaths in the explosion).

.

2011-10-10:  Yesterday, did anyone remember the myth that is … and the man of Latin America that wasDr. Ernesto ‘EL CHE’ Guevara de la Serna Lynch … assassinated on 9 October 1967, in Bolivia ??

Colour photograph showing a framed head and shoulders of the young Dr. Ernesto 'CHE' Guevara de la Serna Lynch in a small museum in the central square of Yara (Plaza Grito de Yara), Cuba. Centuries earlier, nearby, the Indian hero Hatuey was burned at the stake. Photograph by CJ Walsh. 2007-04-10. Click to enlarge.
Colour photograph showing a framed head and shoulders of the young Dr. Ernesto ‘CHE’ Guevara de la Serna Lynch in a small museum in the central square of Yara (Plaza Grito de Yara), Cuba.  Centuries earlier, nearby, the Indian hero Hatuey was burned at the stake.  Photograph by CJ Walsh.  2007-04-10.  Click to enlarge.

.

Dr. Che Guevara addressing the United Nations General Assembly in New York, 11 December 1964 …

English Translation: https://www.marxists.org/archive/guevara/1964/12/11.htm

.

Colour photograph showing the memorial in Plaza de la Revolución, Santa Clara, Cuba ... built to commemorate the 30th anniversary of the Battle for Santa Clara. Unveiled on 28 December 1988, it was designed by the Architect Jorge Cao Campos and the Sculptor José Delarra. The memorial complex also comprises the mausoleum of Che Guevara and a museum. Photograph by CJ Walsh. 2007-04-14. Click to enlarge.
Colour photograph showing the memorial in Plaza de la Revolución, Santa Clara, Cuba … built to commemorate the 30th anniversary of the Battle for Santa Clara.  Unveiled on 28 December 1988, it was designed by the Architect Jorge Cao Campos and the Sculptor José Delarra.  The memorial complex also comprises the mausoleum of Che Guevara and a museum.  Photograph by CJ Walsh.  2007-04-14.  Click to enlarge.

.

Colour photograph showing the memorial in Plaza de la Revolución, Santa Clara, Cuba ... built to commemorate the 30th anniversary of the Battle for Santa Clara. Unveiled on 28 December 1988, it was designed by the Architect Jorge Cao Campos and the Sculptor José Delarra. The memorial complex also comprises the mausoleum of Che Guevara and a museum. Photograph by CJ Walsh. 2007-04-14. Click to enlarge.
Colour photograph showing the memorial in Plaza de la Revolución, Santa Clara, Cuba … built to commemorate the 30th anniversary of the Battle for Santa Clara.  Unveiled on 28 December 1988, it was designed by the Architect Jorge Cao Campos and the Sculptor José Delarra.  The memorial complex also comprises the mausoleum of Che Guevara and a museum.  Photograph by CJ Walsh.  2007-04-14.  Click to enlarge.

.

Colour photograph showing the memorial in Plaza de la Revolución, Santa Clara, Cuba ... built to commemorate the 30th anniversary of the Battle for Santa Clara. Unveiled on 28 December 1988, it was designed by the Architect Jorge Cao Campos and the Sculptor José Delarra. The memorial complex also comprises the mausoleum of Che Guevara and a museum. Photograph by CJ Walsh. 2007-04-14. Click to enlarge.
Colour photograph showing the memorial in Plaza de la Revolución, Santa Clara, Cuba.  Hasta La Victoria Siempre ! (Ever Onward To Victory !)  Photograph by CJ Walsh. 2007-04-14. Click to enlarge.

.

Colour photograph showing a hoarding on the roof of a building in Cienfuegos, Cuba ... which comprises an image of CHE, with the accompanying text "Tu Ejemplo Vive - Tus Ideas Perduran". Photograph by CJ Walsh. 2007-04-13. Click to enlarge.
Colour photograph showing a hoarding on the roof of a building in Cienfuegos, Cuba … which comprises an image of CHE, with the accompanying text: ‘Tu Ejemplo Vive – Tus Ideas Perduran’ (Your Example Lives – Your Ideas Last).  Photograph by CJ Walsh.  2007-04-13.  Click to enlarge.

.

.

END

#ErnestoCheGuevara #ElChe #Bolivia #Assassination #USA #CIA #GuerrilleroHeroico #SantaClara #Cuba #HastaLaVictoriaSiempre #LaHiguera #Revolution #Ireland #CheMemorialStamp

Check Now for Child Safe Window Blinds & Other Coverings !

2011-09-27:  A recent child fatality in Ireland has alerted our population to the common danger of  Window Blinds, Shades and Other Window Coverings which are not Child Safe.

Colour photograph showing a small child reaching for the control wand of a Vertical Window Blind in familiar surroundings, for example, at home. This is just one of a range of Child Safe Window Covering Solutions.
Colour photograph showing a small child reaching for the control wand of a Vertical Window Blind in familiar surroundings, for example, at home. This is just one of a range of Child Safe Window Covering Solutions.

.

In Ireland … our Consumer Protection Laws are weak … our National Consumer Protection Organizations are even weaker … and the National Standards Authority of Ireland (NSAI) is under-resourced, and not fit for purpose.

In the European Union (EU) … a work programme, having the aim of eliminating the risk of strangulation and internal asphyxiation due to child accessible window covering cords and small parts, only commenced in the early part of 2011.  Refer to this Page on the WebSite of the European Commission’s Directorate General for Health & Consumers (DG SANCO)http://ec.europa.eu/dgs/health_consumer/dyna/enews/enews.cfm?al_id=1109

.

HOWEVER, back on 15 December 2009 the United States Consumer Product Safety Commission (CPSC)  issued the following Press Release …

CPSC Announces Voluntary Recalls to Repair Millions of Roman Shades and Roll-Up Blinds by Multiple Firms

WASHINGTON, D.C. – The U.S. Consumer Product Safety Commission (CPSC) is announcing that multiple firms are recalling millions of units of Window coverings, including Roman shades and roll-up blinds.  These window coverings present a serious risk of strangulation to young children.

Colour photograph showing a common type of Window Blind, in Europe, which has caused Child Fatalities.
Colour photograph showing a common type of Window Blind, in Europe, which has caused Child Fatalities.

CPSC has received reports of five deaths and 16 near-strangulations in Roman shades since 2006, and three deaths in roll-up blinds since 2001.  Strangulations in Roman shades occur when a child places his/her neck between the exposed inner cord and the fabric on the back side of the blind or when a child pulls the cord out and wraps it around his/her neck.  Strangulations in roll-up blinds occur when the lifting loop slides off the side of the blind and a child’s neck becomes entangled on the free-standing loop or if a child places his/her neck between the lifting loop and the roll-up blind material.

The recalled Roman shades and roll-up blinds were sold by a variety of manufacturers and retailers, including major discount department stores, home improvement stores and window covering manufacturers and retailers.  Remedies vary among firms from repair kits to refunds.

“Parents need to make sure there are no accessible cords on the front, side, or back of their window coverings”, said CPSC Chairperson Inez Tenenbaum.  “Avoid these deadly dangers by getting the repair kit or installing cordless window coverings in all homes where small children live or visit.”

To help prevent child strangulation in window coverings, CPSC and the  Window Covering Safety Council  urge parents and caregivers to follow these guidelines:

  • Examine all shades and blinds in the home.  Make sure there are no accessible cords on the front, side or back of the product.  CPSC recommends the use of cordless window coverings in all homes where children live or visit.
  • Do not place cribs, beds and furniture close to windows with corded window coverings because children can climb on them and gain access to the cords.
  • Make loose cords inaccessible.
  • If the window shade has looped bead chains or nylon cords, install tension devices to keep the cord taut.

.

A Table at the end of the CPSC Press Release (15 December 2009) indicated that  IKEA was ‘voluntarily’ recalling 3,360,000 Roman Shades, Roller Blinds and Roll-Up Blinds from its stores, nationwide in the USA.  Don’t worry … I blinked, and then re-checked that number !

What has IKEA done in its stores, continent wide in Europe ??

.

.

END