Client Organizations

Mainstream Good Design & Accessibility for All Signage ?

2013-03-06:   Further to an earlier Post, dated 30 November 2012 … on Sustainable Accessibility for All

Accessibility IS a Fundamental Human Right !

‘ For many Weak and Vulnerable People, today’s Complex Human Environment is inaccessible and unsafe … a hostile ‘reality’ which prevents independent functioning and participation in a local community;  it is a blatant denial of their human rights.’

Relevant Human Environment (social – built – virtual – institutional) Factors … factors which are external, or extrinsic, to the context of a person’s life and living situation … include policies and standards, negative attitudes and stigma, lack of services, problems with service delivery, inadequate funding, lack of accessibility in the built environment and to electronic, information and communication technologies, lack of consultation and involvement, and an absence of reliable data and evidence.

Accessibility for All …

Take a really close look at the photograph below … and see a staircase which, in spite of all the legislation in the EU Member States, contravenes almost every accessibility-related design guideline.  It is far from being an unusual scene in our European Built Environment …

Staircase Egress - Unsafe, Difficult Accessibility !!
Photograph taken by CJ Walsh. 2009-10-31. Click to enlarge.

Now, imagine the consequences of one, tiny slip …

Which is why our concern must be with Accessibility for All … which includes consciously thinking about children under the age of 5 years, women in the later stages of pregnancy, and frail older people (not all older people !) … and how they use and interact with their surroundings.

In addition, however … our attention must also turn to the large numbers of people, in all of our societies, with health conditions which result in serious impairments, activity limitations and participation restrictions.  As a prime example, consider the Big-4 Non-Communicable Diseases (NCD’s): Cardiovascular Diseases (e.g. heart attacks and stroke), Cancers, Diabetes, and Chronic Lung Diseases.

These 4 NCD’s – targeted in a World Health Organization (WHO) Global NCD Campaign – share health risk factors (tobacco use, unhealthy diet, lack of physical activity, harmful alcohol use) … cause more than 36 million deaths annually (almost 80 % of deaths, from such diseases, occur in low and middle-income countries) … and result in a high proportion of disability (66.5 % of all years lived with disability in low and middle income countries).

NCD’s can limit one or more of a person’s major life and living activities … such as walking, eating, communicating, and caring-for-oneself.  Examples of common NCD-related impairments include paralysis due to stroke, and amputation as a result of diabetic neuropathy.

When Easily Assimilated Signage IS Essential in Buildings …

Good Architectural Design IS ‘intuitive and obvious’ for building users … design characteristics which are critical in the case of Fire Engineering Design.  However, what is intuitive and obvious in Ireland may not be so intuitive and obvious in Turkey … and what is intuitive and obvious in Europe will certainly not be intuitive and obvious in Africa, India, or China.

Architectural & Fire Engineering Design must, therefore, be adapted to Local conditions … culture, social need, etc., etc.

When a building is NOT ‘intuitive and obvious’ for the broad range of potential building users … easily assimilated signage IS essential …

International Standard ISO 21542: ‘Building Construction – Accessibility & Usability of the Built Environment’ was published in December 2011, as a full standard.  In its Introduction, ISO 21542 is linked to the U.N. Convention on the Rights of Persons with Disabilities (CRPD) … almost like an umbilical cord.

The scope of ISO 21542 covers public buildings.  The Accessibility Agenda in the U.N. Convention is very broad … so much standardization work remains to be completed at international level.

Concerning Accessibility Symbols and Signs … reference should be made to ISO 21542: Clause 41 – Graphical Symbols … and on Pages 106, 107, 108, and 109 … the following will be found:

  • Figure 66 – Accessible Facility or Entrance ;
  • Figure 67 – Sloped or Ramped Access ;
  • Figure 68 – Accessible Toilets (male & female) ;
  • Figure 69 – Accessible Toilets (female) ;
  • Figure 70 – Accessible Toilets (male) ;
  • Figure 71 – Accessible Lift / Elevator ;
  • Figure 72 – Accessible Emergency Exit Route.

I use the word ‘accessibility’, and not ‘access’ … because Accessibility has been defined in ISO 21542 as including … ‘access to buildings, circulation within buildings and their use, egress from buildings in the normal course of events, and evacuation in the event of an emergency’.

A note at the beginning of the standard also clarifies that Accessibility is an independent activity, i.e. assistance should not be necessary … and that there should be an assurance of individual health, safety and welfare during the course of those (accessibility-related) activities.

During the very long gestation of ISO 21542, an overwhelming consensus emerged in favour of using the term Accessibility for All … thereby sidestepping the thorny issue of different design philosophies which are described as being accessibility-related but, in practice, are limited and/or no longer fit-for-purpose.

'Accessibility for All' Symbol ?The Accessibility Symbol used throughout ISO 21542 is shown above.  I know that a small group of people from different countries worked very hard on this particular part of the standard.  My only contribution was in relation to the inclusion of Figure 72, concerning Fire Evacuation.

This ‘accessibility’ symbol is an attractive, modern and, of course, abstract representation of a concept … a person with an activity limitation using a wheelchair.  The symbol succeeds very well in communicating that concept.

However … as an Accessibility for All Symbol … encompassing people with other than functional impairments, e.g. hearing and visual impairments … and children under the age of 5 years, women in the later stages of pregnancy, frail older people … and people with the four main types of non-communicable disease discussed above … is this symbol, also, limited and no longer fit-for-purpose ??

.

Proposed New Sign for 'Area of Rescue Assistance'

.

Shown next, above, is the proposal for a new Area of Rescue Assistance Sign … which is contained in ISO 7010:2011 / FDAM 115 (2013).  While it is nice to finally see this Safety Sign appear in the mainstream of safety signage … the title being proposed for the sign and the explanatory texts which accompany it are very problematic …

  • The technical term being proposed – Evacuation Temporary Refuge – is too long and too difficult to understand ;
  • The explanatory texts which accompany this Sign are very confusing and misleading.

This problem has arisen because the people who drafted ISO 7010:2011 / FDAM 115 (2013) hadn’t a bull’s notion that ISO 21542 even existed !

In ISO 21542, we use the term Area of Rescue Assistance … which is easy for everybody to understand, including building users, building managers and firefighters, etc., etc.

We also explained, in ISO 21542, that a Place of Safety is a remote distance from the building … not anywhere inside the building !

.

Mainstreaming Disability …

U.N. CRPD – Preamble

(g)  Emphasizing the importance of mainstreaming disability issues as an integral part of relevant strategies of sustainable development,

As ‘disability’ moves closer towards … and is integrated and fully included in the ‘mainstream’ of sustainable community life and living … it is absolutely imperative that individuals and organizations who make up the Disability Sector become much more cohesive (far less fractious within) … that they begin to fully understand the practices and procedures of the mainstream … and actively and robustly engage with that mainstream.

It is ridiculous, for example, that a large amount of the Sector’s energy is still being diverted into meaningless meditations and endless tracts on whether it is ‘universal design’, or ‘design-for-all’, or ‘inclusive design’, or ‘facilitation design’, etc … when an entirely new design paradigm is being demanded by a world (our small planet when seen from the moon !), which is experiencing enormous levels of human poverty, natural resource shortages, human rights violations, and severe weather events.  The overriding priority must be ‘real’ implementation … Effective Accessibility for All !

.

'Earthrise' from Apollo 14
Colour photograph – ‘Earthrise’ – taken from the Apollo 14 Spacecraft … showing a bright colourful Earth, in a dense black ‘sky’, rising above the pale surface of the Moon. Click to enlarge.

NASA’s Gateway to Astronaut Photography of Earth

.

And … Effective Accessibility for All is but one component of …

‘Social Wellbeing for All in a Sustainable Built Environment’

Refer also to …

2004 Rio de Janeiro Declaration on Sustainable Social Development, Disability & Ageing

.

.

.

Update:  2013-05-31 …

While the wider international design community is working hard on developing an array of Accessibility Symbols to facilitate different health condition and impairment categories, and to suit different environmental situations, e.g. a fire emergency in a building … I recently encountered another interesting contribution …

Alternative Accessibility Symbol (USA-2011) - Functional Impairment
Click to enlarge. For more information: www.accessibleicon.org

Any comments ??

.

.

END

Ireland’s Draft National Radon Control Strategy – A Fraud !!

2013-02-28:  Submissions on Ireland’s Draft National Radon Control Strategy must arrive at the Department of the Environment, Community & Local Government, our national authority having jurisdiction … by e-mail or hand delivery to either the Custom House in Dublin or the DECLG Offices in Wexford … no later than 17:30 hrs tomorrow, Friday 1 March 2013

DECLG - Draft National Radon Control Strategy Title Page (January 2013)

Ireland’s Draft National Radon Control Strategy – January 2013 Consultation

Click the Link above to read/download PDF File (425 Kb)

The Aim of this Draft Strategy, as stated on the DECLG WebSite, is to ensure that exposure to Radon Gas, which presents a significant public health problem, is addressed in an effective and co-ordinated way across all relevant public authorities through appropriate interventions.  The Draft Strategy was developed by an Inter-Agency Group comprising representatives from relevant public authorities.

.

After all of the progress made on radon protection in buildings at the end of the 1990’s and beginning of the 2000’s, it is extremely disappointing to read this miserable excuse for a strategy document.  If the general public in Ireland is under any impression that the ‘powers-that-be’ are deeply concerned about protecting our health … they are making a fatal mistake !

The complete absence of any reference to a Recommended Health-Related Radon Target Level – Safety-Related National Reference Levels which are not clearly explained will result in some injury and harm – Lack of Meaningful Consultation with, and Informed Consent of, the National Population – Horrendously Inadequate Technical Control Procedures on Irish Building Sites – RPII Recommended Indoor Radon Activity Measuring Devices having Very High Measurement Uncertainty (±30% under typical conditions of use) – A Purposeful Lack of Detailed Guidance on Exactly When and How to Measure Indoor Radon – Inadequate RPII Radon Measurement Test Reporting … are just some of the tell-tale signs for a seasoned observer.

In this regard, therefore … and let me be very clear and simple in my use of language … this Draft National Radon Control Strategy is a blatant fraud !!

Fraud:  Deliberate deception, trickery, or cheating intended to gain an advantage – An act or instance of such deception (from Latin Fraus (f): deceit, deception).

Furthermore … the Inter-Agency Group which produced this Draft National Radon Control Strategy for the DECLG Minister, Mr. Phil Hogan T.D., and Senior Civil Servants within the Department … whoever the Group’s participants are, wherever they are … should be thoroughly ashamed of themselves for being associated with this negligent act !

Negligent:  Lacking attention, care or concern.

Negligence:  A wrong whereby a person(s) is in breach of a legal duty of care, resulting in harm or injury to another person(s) … in this case, the Irish Public.

To see a complete overview on this Serious Building-Related Human Health Issue, and for information about a Far Better and More Coherent Approach to Radon Protection in Buildings which takes proper account of European Union (E.U.) legislation, e.g. the Precautionary Principle … please refer to SDI’s Corporate WebSite

NORM, Radon Gas, Radon Activity & Protection from Radon in Buildings

(It is not my intention to reproduce, here, all of the content on this WebPage as part of the Submission.)

I am also the Technical Consultant who drafted these 2 Benchmark Irish Agrément Board (IAB) Certificates for Radon Protection Measures in Buildings …

Monarflex Radon Resisting Membranes – IAB Certificate No. 98/0075

and

Radon Control Systems: Easi-Sump & Easi-Sump Cap-Link – IAB Certificate No. 01/0130

.

SDI’s Comments on Ireland’s Draft National Radon Control Strategy (NRCS)

1.   Protecting Human Health versus Reducing Risk to Safety

The following two short extracts from 1. Introduction and Background in the Draft NRCS reveal the true intent of the Inter-Agency Group …

‘ Radon gas is the greatest source of exposure to ionising radiation for the general public and is the second greatest cause of lung cancer in Ireland.  Recognising the serious health risk presented by radon, the Minister for the Environment, Community and Local Government in November 2011 established an inter-agency group to develop a National Radon Control Strategy (NRCS).’

and …

‘ During 2012 the inter-agency group developed a draft NRCS based on wide stakeholder consultation and a health economics evaluation of different radon intervention strategies.  The stakeholder consultation involved a range of individuals and bodies involved in: health care, construction, radon services, Government and academia.  The health economics evaluation was undertaken by the Radiological Protection Institute of Ireland (RPII) and Health Service Executive (HSE) with the assistance of the Health Economics Unit at the University of Oxford.  This draft strategy sets out a range of measures to reduce the risk from radon to people living in Ireland.’

Radon is a serious human health issue, and it is explained in a later section of the document 1.2 The Radon Problem in Ireland that ‘indoor radon is linked to between 150 to 200 lung cancer deaths each year in Ireland, which equates to approximately 13% of all lung cancer deaths.’

However … after the references above to ‘health economics evaluation’ (!) … to the ‘prevailing  economic situation’ (!!) in section 1.1 Public Consultation … and to ‘health economics tools’ (!!!) in section 2. Draft National Radon Control Strategy … etc … you should then sensitize yourself to the subtle change in language very early in the document … from a consideration of health protection, to reducing the risk from radon (or similar variations on that theme).

The concept of Protecting Human Health is altogether different from the concept of Assessing and Mitigating / Reducing Risk to Safety !   Please refer to SDI’s Corporate WebSite.

As far back as the end of the 1990’s … the Irish Agrément Board, which at the time included a representative from the Department of the Environment, accepted the following …

Radon Activity in Buildings – Recommended Target Health Level

Radon Activity (incl. Rn-222, Rn-220, RnD) should, on average, fall within the range of 10-40 Bq/m3, but should at no time exceed 60 Bq/m3.

This Recommended Target Health Level for Radon now also appears in International Standard ISO 21542: ‘Building Construction – Accessibility & Usability of the Built Environment’, which was published in December 2011.  Please refer to Annex B.8 – Indoor Air Quality (IAQ) in the ISO Standard.

The Draft NRCS must refer to such a Recommended Target Health Level … and it must be stated that it is National Policy to progressively reach that target by 2025 (bearing in mind the ‘prevailing economic situation’ in the country !).

Note:  In contrast to the above … 200 Bq/m3 for Residential Buildings, and 400 Bq/m3 for Workplaces … are NOT Health-Related Target Levels … they are Safety-Related National Radon Reference Levels which result in some measure of harm and injury to people … particularly children under the age of 10 years, and people with activity limitations who constantly remain indoors for prolonged periods of time.

.

2.   National Policy Priority:  ‘Real’ Protection from Radon in ‘Real’ Irish Buildings

Yes … in Ireland, we have enormous problems with regard to a lack of awareness among the general population about the serious health hazard posed by indoor radon … and the absence of proper education and training for everyone directly involved in the design, construction, management, operation, servicing or maintenance of our building stock (both new and existing).

BUT … if we are committed to providing ‘real’ radon protection in ‘real’ Irish buildings, then a practical construction-oriented approach is demanded.

This is a Key Paragraph in 2.1 Radon Prevention in New Buildings

‘ The stakeholder engagement also points to some practical difficulties associated with the implementation of the current technical guidance on radon prevention.  These difficulties relate to the correct installation of radon barriers under site conditions, protection of the integrity of radon barriers once installed and identification of radon preventive measures on site.  The stakeholder engagement also indicated the system of building control in place prior to 2012 did not provide adequate assurance that radon preventive measures had been correctly installed ‘

… which we later discover is a masterstroke of understatement and evasion, because none of these important issues are tackled head on in the document.

On the critical issue of Building Control … there is no mention of mandatory inspections of construction projects by competent Local Authority personnel.  Because … it remains the unwritten policy of Ministers and Senior Civil Servants in Ireland’s Department of the Environment, Community & Local Government (DECLG) that Local Authority Building Control Sections will be entirely ineffective.

On the other hand … will Competent Private Independent Technical Controllers be facilitated in carrying out sufficient inspections of all radon protection related works before ‘signing off’ on proper completion ???

.

3.   Regulatory Status of RPII’s Radon Prediction Maps

This is NOT a problem unique to Ireland.

The presence of the RPII Radon Prediction Maps in Technical Guidance Document C (Building Regulations), and the status they are given there … are both entirely inappropriate.

While these Maps are a useful design aid, in the case of small construction projects, they offer NO assurance of certainty to either building designers or users.  They are NOT reliable !   And the average values shown in any particular ‘box’ may actually conceal a considerable degree of variability in the radon concentrations found in completed buildings.

.

4.   SDI’s Acceptance of RPII Services

Please refer to SDI’s Corporate WebSite.

Unfortunately, until the Radiological Protection Institute of Ireland (RPII) includes proper statements of Measurement Uncertainty in its Test Reports (this is a requirement of European Standard EN ISO/IEC 17025)  … our Organization:

  • cannot recommend any RPII Radon Testing Services to 3rd Parties ;

and

  • will not accept any RPII Test Reports as proper evidence of Radon Test results.

.

C. J. Walsh – Consultant Architect, Fire Engineer & Technical Controller – Managing Director, Sustainable Design International Ltd. – Ireland, Italy & Turkey.

.

.

END

Enhanced by Zemanta

‘Building External Lighting Design’ – An SDI Professional Service

2013-01-30:  The Energy Efficiency of Electrical Light Fittings continues to improve dramatically … and it’s about time too.  So much energy was needlessly wasted before !

Prior to the commencement of the External Lighting Design Project below … this prominent religious building in Dublin City was ‘pitch’ dark at night, almost a black hole in the local urban landscape, a depressing non-entity … people waiting at bus stops on each of the roads beside the building were nervous … muggings occasionally took place … litter was always being thrown into the grounds surrounding the building … evidence screaming out loud that nobody cared !

External Lighting Design Project - Prominent Religious Building, Dublin City, Ireland
Colour photograph showing the finished External Lighting Project for a prominent religious building in Dublin City, Ireland. Project Design and Supervision of Installation by CJ Walsh. Electrician: W. Fleming, Electrical Services. Click to enlarge.

.

After Project Completion … the ‘presence’ of this building within the local community was enhanced to an extraordinary extent … it was at once seen to be at its centre … security issues at night were immediately resolved … the building looked as if people cared about it … and a special bonus … architectural features which usually went unnoticed by the public during the day were beautifully highlighted at night.

The Client Organization … in this case, a religious order … was so pleased with the finished work that they commissioned a professional photographer … and then used the image above on the Parish Christmas Cards to be distributed to parishioners.

The Moral of The Story for Clients/Client Organizations is … give serious consideration to how your building (whether it is a church, mosque, or synagogue) looks during daylight … and most importantly, during the long hours of darkness !

External Building Lighting is much more than mere decoration … it is an essential component in the sustainable design of any important / iconic building type !!

.

SDI Contact Information

E-Mail:  cjwalsh@sustainable-design.ie

International Phone:  +353 1 8386078   /   National Phone:  (01) 8386078

.

.

END

Enhanced by Zemanta

SDI Christmas Greetings & Looking Forward to the New Year !

2012-12-29:  Now that the hustle and bustle of Christmas Day has passed … it is time to relax and chill out during this quiet period … the week between Christmas Day and New Year’s Day … to think of loved ones and friends, at home and abroad … to extend warm Christmas Greetings to our many collaborators, clients and suppliers … and to look forward to the New Year of 2013 … a time, hopefully, for Transformation and Creative Re-Organization !

At first, this Japanese Print reminds me very much of the Cherry Blossom Walk in Osaka, and each year looking forward to Spring … but it also tells a story about people …

Colour image of a Japanese Print: 'Evening Cherry at Nakanocho in the Yoshiwara', dating from circa 1834-35, by the artist Hiroshige. Click to enlarge.
Colour image of a Japanese Print: ‘Evening Cherry at Nakanocho in the Yoshiwara‘, dating from circa 1834-35, by the artist Hiroshige. Click to enlarge.

… and then how, in a built environment which is becoming more and more complex, a diverse and healthy flora and fauna is an essential component of ‘person-centred’ design … and how, despite the wonder of electricity, it is important to remain intimately connected with the pattern of nature’s seasons, and the rhythm of day and night.

Merry Christmas – Auguri per un Luminoso 2013 – Çok Teşekkür Ediriz !

.

.

END

Enhanced by Zemanta

‘Sustainable Fire Engineering for All’ – SDI’s Professional Service

2012-12-14 & 2012-12-30:  Further to this distressing incident … which exposed a profound lack of awareness, care and competence within the general fire safety industrial sector …

Recent Fatal Fire at a Disabled Workshop in SW Germany

… this is how we would like to help you … whether you are an individual, or an organization … whether you are located in Ireland, Italy or Turkey … some other part of Europe, the Arab Gulf Region, India, Japan, China … or wherever !

And … we can, if requested or necessary, work in collaboration with local partners in those different geographical regions.

– FireOx International is the Fire Engineering Division of Sustainable Design International Ltd. (SDI) –

.

Colour photograph showing the 2 World Trade Center Towers, in New York City, immediately after the second plane impact. The mechanical damage arising from such a plane impact had been considered in the Initial Building Design Process; incredibly, any type of Fire Incident had not ! In the case of both towers and within a short period of time, Fire-Induced Progressive Damage resulted in Disproportionate Damage, and eventual Total Building Collapse. The horror and carnage at the World Trade Center Complex, and the extensive collateral damage to everywhere south of Canal Street, caused enormous long-term damage to the economy of Manhattan ... and had a very significant adverse impact on Global Financial Markets. Click to enlarge.
Colour photograph showing the 2 World Trade Center Towers, in New York City, immediately after the second plane impact. The mechanical damage arising from such a plane impact had been considered in the Initial Building Design Process; incredibly, any type of Fire Incident had not ! In the case of both towers and within a short period of time, Fire-Induced Progressive Damage resulted in Disproportionate Damage, and eventual Total Building Collapse. The horror and carnage at the World Trade Center Complex also caused enormous long-term damage to the economy of Manhattan … and had a very significant adverse impact on Global Financial Markets. Click to enlarge.

.

Introduction

Fundamentally, the 9-11 World Trade Center Incident in New York (2001) was an Extreme ‘Real’ Fire Event.  It presented the International Fire Engineering Community with a catastrophic failure in conventional practices and procedures related to:

  • Fire Engineering, Structural Engineering, and Architectural Design ;
  • Human Building Management Systems ;
  • Emergency Response by Firefighters, Rescue Teams, and Medical Personnel ;
  • National and Local Organizations Having Authority or Jurisdiction (AHJ’s) ;

… and with the serious problem of entirely inadequate Fire Safety Objectives in the building legislation, model codes and design standards of the most economically advanced countries in the world.

Those people who understand the building design process, and have experience as construction practitioners, have long realised that the lessons from 9-11 must be applied across the full spectrum of building types … not just to tall buildings.  Right up to the present day, unfortunately, many people in the International Fire Engineering Community are either unwilling, or unable, to do this.

Furthermore … Fire Engineering, Architectural Design and Structural Engineering must, of urgent necessity, be seamlessly conjoined … with the aim of removing misunderstandings and the wide gaps in client service delivery between the different disciplines.

In 2002, a series of Long-Term 9-11 Survivor Health Studies commenced in the USA … and in 2005 and 2008, the U.S. National Institute of Standards and Technology (NIST) issued a series of Post 9-11 Critical Recommendations concerning the design, construction, management and operation of buildings.

At FireOx International … we have fully integrated this essential design guidance into our frontline fire engineering and architectural practice … we have developed unique and practical solutions for worldwide application, some of which appear in International Standard ISO 21542: ‘Building Construction – Accessibility & Usability of the Built Environment’, published in December 2011.

.

Colour photograph showing an armed assailant during the November 2008 'Hive-Attack' on Mumbai ... an extraordinarily violent, co-ordinated assault on the largest (and wealthiest) city in India, which involved the strategic targeting of built environment Places of Public Resort, Iconic Buildings, High-Rise Buildings, Buildings having a Critical Function, Transport Infrastructure and Service Utilities ... with the aim of causing widespread terror among the general population, including tourists, and disruption to the city’s important economic environment. Click to enlarge.
Colour photograph showing an armed assailant during the November 2008 ‘Hive-Attack’ on Mumbai … an extraordinarily violent, co-ordinated assault on the largest (and wealthiest) city in India, which involved the strategic targeting of built environment Places of Public Resort, Iconic Buildings, High-Rise Buildings, Buildings having a Critical Function, Transport Infrastructure and Service Utilities … with the aim of causing widespread terror among the general population, including tourists, and disruption to the city’s important economic environment. Click to enlarge.

.

FireOx International’s Commitment to You

As a necessary response to the New 21st Century Paradigm of Real Extreme Event in a Built Environment which is becoming more and more complex … is subject to climate change and severe weather events … and is vulnerable to malign and malevolent disruption –

WE are committed to … the implementation of a Sustainable Human Environment which is Fire Safe and Secure for All, meaning that an ‘appropriate project-specific fire safety level’ is our fire engineering objective, with ‘human health protection’ targeted as a priority … through the use of innovative, reliability-based and person-centred sustainable design practices and procedures.

.

What is an ‘Appropriate Fire Safety Level’ in Your Building or Facility ?

It is rarely, if ever, explained to clients/client organizations that the Minimal Fire Safety Objectives in building legislation are focused solely on protecting the ‘interests’ of society, not those of the individual …  are, quite often, inadequate and/or flawed … and are, always, revised only after the latest tragedy !

To properly protect Your Interests as a client/client organization … we strongly advise that the Appropriate Level of Fire Safety in Your Building or Facility should exceed the minimal level of safety required by building legislation.  We would also caution that, in many jurisdictions (e.g. India), compliance with national building legislation is voluntary.

Which raises the issues of whether or not you will actually get what you pay for, and whether or not the Fire Protection Measures in Your Building or Facility are reliable (in other words, will they perform as intended at the time of a ‘real’ fire, which may occur at any time in a building’s long life cycle) !?!   Competent Technical Control of Design and Construction, independent of the design and construction organization(s), is essential.

You should carefully consider the following spectrum of issues which may be directly relevant to Your Project.  Following a process of consultation with you, we then develop Project-Specific Fire Engineering Design Objectives … bearing in mind that you must also comply with safety at work, anti-discrimination, and environmental legislation, etc … maintain business continuity, etc … be energy efficient, etc … and be socially responsible, etc …

–     Protection of the Health of All Building Users … including People with Activity Limitations (2001 WHO ICF), Visitors to the building or facility who may be unfamiliar with its layout, and Contractors or Product/Service Suppliers temporarily engaged in work or business transactions on site ;

–     Protection of Property from Loss or Damage … including the Building or Facility, its Contents, and Adjoining or Adjacent Properties ;

–     Safety of Firefighters, Rescue Teams and Other Emergency Response Personnel ;

–     Ease and Reasonable Cost of ‘Effective’ Reconstruction, Refurbishment or Repair Works after a Fire ;

–     Sustainability of the Human Environment (social – built – virtual – economic) … including Fitness for Intended Use and Life Cycle Costing of fire engineering related products and systems, etc … fixed, installed or otherwise incorporated in the building or facility ;

–     Protection of the Natural Environment from Harm, i.e. Adverse or Damaging Impacts.

.

FireOx International – Our Fire Engineering Services

  • WE  will advise you on Fire Safety Policy, Fire Safety Strategy Development, Fire Safety Implementation … and, whether you are within or from outside the European Union, on CE Marking of Fire Protection Related Construction Products

  • WE  understand the process of Design, particularly the new language of Sustainable Design … and we will produce Creative Fire Engineering Solutions for Your Project

  • WE  are thoroughly familiar with the intricacies of Building Sites … and we will verify and/or validate Design Compliance during construction, and at project completion … and, if requested or necessary, as a completely Independent Technical Controller ; 

  • WE  communicate easily and effectively with other Professional Design Disciplines, including architects and structural engineers … and we will act as fully participating members of Your Project Design & Construction Team … and, if requested or necessary, as the Design Professional in Responsible Charge **

  • WE  practice in accordance with a comprehensive Professional Code of Ethics

.

Sustainable Fire Engineering Solutions ?

  1. Are adapted to Local Geography, Climate/Climate Change, Social Need, Culture, Economy … and Severe Events (e.g. earthquakes, flooding) ;
  2. Are ‘Reliability-Based’, i.e. that design process based on practical experience, competence and an examination of real extreme events, e.g. 2001 WTC 9-11 & 2008 Mumbai Attacks, and 2011 Fukushima Nuclear Incident … rather than theory alone ;
  3. Are ‘Person-Centred’, i.e. that design process which places ‘real’ people at the centre of creative endeavours and gives due consideration to their responsible needs, and their health, safety, welfare and security in the Human Environment.

.

FireOx International’s Contact Information

E-Mail:  cjwalsh@sustainable-design.ie

International Phone:  +353 1 8386078   /   National Phone:  (01) 8386078

.

.

Important Note:  This Post should be read in conjunction with an earlier Post …

Sustainable Design International Ltd. – Our Practice Philosophy

It is there, not here, that we define Sustainable Human & Social Development … and describe how our Practice is responding to this open, intricate, dynamic, and still evolving concept.  The resulting transformation in how frontline services are provided to our Clients/Client Organizations ensures a much more comfortable ‘fit’ to their needs … and a greater level of protection, safety and security for society !

.

[ ** 2005 NIST(USA) Final Report on 9-11 World Trade Center 1 & 2 Tower Collapses

– Footnote 49 –

… the Design Professional in Responsible Chargeusually the lead architect – ensures that the (Design) Team Members use consistent design data and assumptions, co-ordinates overlapping specifications, and serves as the liaison with enforcement and review officials, and with the client or client organization. ]

.

.

END

Enhanced by Zemanta

‘Sustainable Accessibility for All’ – An SDI Professional Service

2012-11-30:  Related specifically to my 2 Previous Posts on 27 November 2012 & 28 November 2012 … this is how we would like to help you … whether you are an individual, or an organization … whether you are located in Ireland, Italy or Turkey … some other part of Europe, the Arab Gulf Region, India, Japan, China … or wherever !

And … we can, if requested or necessary, work in collaboration with local partners in those different geographical regions.

Introduction

For many Weak and Vulnerable People, today’s Complex Human Environment is inaccessible and unsafe … a hostile ‘reality’ which prevents independent functioning and participation in a local community;  it is a blatant denial of their human rights.

Restrictions on Social Participation, e.g. physical barriers, sloppy user-unfriendly management procedures, discrimination, stigma, etc … also limit the Use Potential of buildings, transportation systems, public spaces and other facilities … shortening product life cycles.

These factors impose a large, negative cost burden on society generally … and on you, as an individual … or as an organization, whether private or public.  It is bad business !

.

Colour photograph showing a main circulation route at a Railway Station in Kyoto, Japan ... with combined staircase and elevators. Notice, in particular, the dual height staircase handrails, for adults and children ... the strong contrast of the floor tactile information (a 'directional' indicator leading to a 'hazard' indicator, at the top of the staircase) compared to the rest of the floor, with its broad non-slip strips ... and, finally, arrows used to control staircase circulation flows at peak periods (down to the right, up on the left). Photograph taken by CJ Walsh. 2010-04-27. Click to enlarge.
Colour photograph showing a main circulation route at a Railway Station in Kyoto, Japan … with combined staircase and elevators. Notice, in particular, the dual height staircase handrails, for adults and children … the strong contrast of the floor tactile information (a ‘directional’ indicator leading to a ‘hazard’ indicator, at the top of the staircase) compared to the rest of the floor, with its broad non-slip strips … and, finally, arrows used to control staircase circulation flows at peak periods (down to the right, up on the left). Photograph taken by CJ Walsh. 2010-04-27. Click to enlarge.

.

SDI’s Commitment to You

As a necessary response to the New Paradigm of ‘Accessibility’ mandated by the United Nations Convention on the Rights of Persons with Disabilities (CRPD), and elaborated in greater detail by International Standard ISO 21542 : 2011

WE are committed to … the implementation of a Sustainable Human Environment which is Effectively Accessible for All … through the use of innovative, person-centred and reliability-based sustainable design practices and procedures.

.

Colour photograph showing a Large Tactile Floor Plan at one of the entrances to the terminal building at Ciampino Airport in Rome, Italy. Notice, in particular, the use of an easily understandable type font combined with the high contrast between white characters and blue background ... the presentation of information in three different languages: Italian, English and Braille ... and, finally, the panel is mounted at a convenient height and angle. Photograph taken by CJ Walsh. 2011-10-26. Click to enlarge.
Colour photograph showing a Large Tactile Floor Plan at one of the entrances to the terminal building at Ciampino Airport in Rome, Italy. Notice, in particular, the use of an easily understandable type font combined with the high contrast between white characters and blue background … the presentation of information in three different languages: Italian, English and Braille … and, finally, the panel is mounted at a convenient height and angle. Photograph taken by CJ Walsh. 2011-10-26. Click to enlarge.

.

SDI’s Accessibility Services 

  • WE  will advise you on Accessibility Policy, Accessibility Strategy Development, Accessibility Implementation … and, whether you are within or from outside the European Union, on CE Marking of Accessibility Related Construction Products
  • WE  understand the process of Design, particularly the new language of Sustainable Design … and we will produce Creative Accessibility Solutions for Your Project
  • WE  are thoroughly familiar with the intricacies of Building Sites … and we will verify and/or validate Design Compliance during construction, and at project completion … and, if requested or necessary, as a completely Independent Technical Controller ; 
  • WE  communicate easily and effectively with other Professional Design Disciplines, including fire engineers … and we will act as fully participating members of Your Project Design & Construction Team

.

Sustainable Accessibility Solutions ?

  1. Are adapted to Local Geography, Climate/Climate Change, Social Need, Culture, Economy … and Severe Events (e.g. earthquakes and flooding) ;
  2. Are ‘Person-Centred’, i.e. that design process which places ‘real’ people at the centre of creative endeavours and gives due consideration to their responsible needs, and their health, safety, welfare and security in the Human Environment ;
  3. Are ‘Reliability-Based’, i.e. that design process based on practical experience, competence and an examination of real extreme events, e.g. 2001 WTC 9-11 & 2008 Mumbai Attacks, and 2011 Fukushima Nuclear Incident … rather than theory alone.

.

SDI’s Contact Information

E-Mail:  cjwalsh@sustainable-design.ie

International Phone:  +353 1 8386078   /   National Phone:  (01) 8386078

.

.

Important Note:  This Post should be read in conjunction with an earlier Post …

Sustainable Design International Ltd. – Our Practice Philosophy

It is there, not here, that we define Sustainable Human & Social Development … and describe how our Practice is responding to this open, intricate, dynamic, and still evolving concept.  The resulting transformation in how frontline services are provided to our Clients/Client Organizations ensures a much more comfortable ‘fit’ to their needs … and a greater level of protection, safety and security for society !

.

.

END

Enhanced by Zemanta

Recent Fatal Fire at a Disabled Workshop in SW Germany

2012-11-28:  On Monday last, 26 November 2012 … Fire broke out at a Sheltered Workshop for People with Activity Limitations, located in the small municipality of  Titisee-Neustadt, south-western Germany … not too far from the borders of France and Switzerland.  It was approximately 14.00 hrs in the afternoon … in broad daylight.

German news reports put the death toll at 14 People, including 1 Carer … with 10 People injured.

News reports also state that it took 2 Hours for Firefighters to bring this incident under control.  At the time that Photograph 1, below, was taken … smoke had spread throughout a major part of the building.

Viewers should look closely at the top of the external staircase … then, ask yourselves how any person with an activity limitation can be safely rescued, or assisted to evacuate, by means of a ladder (obscured, at the end of the building on the left) … and, finally, notice the positioning of fire hoses on the ground and on the staircase … some of the many issues which have been discussed extensively here before …

Click to enlarge.
Click to enlarge.
Click to enlarge.
Click to enlarge.

.

2005 NIST(USA) Final Report on 9-11 World Trade Center 1 & 2 Tower Collapses

–  Recommendation  #17b  –

 To the degree possible, people with activity limitations should be provided with a means for self-evacuation in the event of a building emergency.  Current strategies (and law) generally require these people to shelter-in-place and await assistance.  New procedures, which provide redundancy in the event that the fire warden system or co-worker assistance (e.g. the buddy system) fail, should consider full building evacuation, and may include use of fire-protected and structurally hardened elevators, motorized evacuation technology, and dedicated communication technologies.

.

At the heart of the impressive show of fire fighting equipment and technology … and the usual reassuring statements by local officials and other people in authority after the event … there is an equally impressive lie …

Photograph by Patrick Seeger(dpa). Click to enlarge.
Photograph by Patrick Seeger(dpa). Click to enlarge.

Current Building Codes and Regulations, Fire Safety Standards, Building Design Practices, and Building Management Procedures … do not seriously consider the safety of People with Activity Limitations … not properly – not adequately – not even INadequately.  Tokenism is the best offer available in just a few European countries.

Photograph by Patrick Seeger(dpa). Click to enlarge.
Photograph by Patrick Seeger(dpa). Click to enlarge.

According to Spiegel OnLine International …

The rescue was difficult because some people panicked, said Local Fire Chief Alexander Widmaier.  “We are dealing here with people who naturally do not respond rationally”, he said.

IF this is an accurate news report, and bearing in mind that it is also a translation … I SAY …

Let us be generous and kind … Local Fire Chief Alexander Widmaier has NO awareness or understanding of People with Activity Limitations and the daily challenges they face in moving around and using a built environment which is inaccessible and unsafe.

According to AFP OnLine …

Gotthard Benitz, of the Titisee-Neustadt fire service, told AFP earlier that the fire began on the ground floor of the building which also had a basement and an upper floor.

“The victims were all on the same floor where the fire was”, he said adding this was the only area to have sustained fire damage and the stairwell had remained smoke-free meaning those on the other two floors had been able to use it.

He also said firefighters were prepared for dealing with an emergency at the workshop as practice fire alarms were regularly carried out there, with the last one having been last year.

The head of Caritas in Germany, Peter Neher, told ZDF public television that emergency practice drills were done regularly.

IF this is an accurate news report, and bearing in mind that it is also a translation … I SAY …

Gotthard Benitz should also look at the top of the external staircase in Photograph 1 above.  IF there are no circulation hazards, e.g. ice, or obstacles, e.g. fire hoses … able-bodied people can easily go up or down a staircase … people who use wheelchairs or other mobility-aid devices cannot.

In their respective positions of responsibility … Gotthard Benitz and Peter Neher should both understand that all building occupants must be facilitated in acquiring the skill of evacuation to a ‘place of safety’, by way of a safe and accessible route.  An emergency practice drill, although carried out regularly once a year … is ENTIRELY inadequate … and will achieve Very Little.

Skill:  The ability of a person – resulting from training and regular practice – to carry out complex, well-organized patterns of behaviour efficiently and adaptively, in order to achieve some end or goal.

Standard fire evacuation training and practice drill procedures must be adapted to the individual-specific abilities of People with Activity Limitations.

.

BUT … the new International Standard ISO 21542 is a very small step in the right direction.  See yesterday’s post.

This situation will only improve to a significant degree, however, when People with Activity Limitations, and their Representative Organizations, begin to act decisively, in unison, and with serious intent …

.

Self-Protection from Fire in Buildings – Personal Check List for People with Activity Limitations

1.     Upgrade ‘My’ understanding of Accessibility

Ease of independent approach, entry, egress, evacuation and/or use of a building and its services and facilities, by all of the building’s potential users – with an assurance of individual Health, Safety and Welfare during the course of those activities ;

2.     Be assertive (not aggressive) with regard to ‘My’ own self-protection in emergency situations ;

3.     Concerning ‘My’ safety … demand that Building Management actively engages in Meaningful Consultation – and receives your Informed Consent ;

4.     Become familiar with the Fire Defence Plan for the building, and know ‘My’ part well ;

5.     Practice – practice – practice … become skilled in evacuation to a Place of Safety ;

6.     Become involved, and participate directly in the Building’s Safety Procedures.

.

Self-Protection from Fire in Buildings  – Must-Do List for Representative Organizations & Groups

1.     Upgrade ‘Our’ understanding of Accessibility in a Social Context, its Current Vocabulary, and its Complexity … groups of individuals wish to socialize together … this is now, afterall, a recognised human and social right !

Ease of independent approach, entry, egress, evacuation and/or use of a building and its services and facilities, by all of the building’s potential users – with an assurance of individual Health, Safety and Welfare, and group Wellbeing, during the course of those activities ;

2.     Be assertive (and aggressive) with regard to the availability of proper Data and Statistics – we must clearly identify ‘Our’ problem with the many restrictions placed on our participation in local communities ;

3.     Produce a working statement of an Individual’s Rights – on 1 Page (!) ;

4.     Issue clear guidelines on Reliable Advocacy ;

5.     Become involved, and participate directly in the improvement of Building Codes and Regulations, Fire Safety Standards, Building Design Practices, and Building Management Procedures ;

6.      Demand resources to Monitor ‘Effective’ Implementation … and Target Relevant and ‘Practical’ Research.

.

.

END

Enhanced by Zemanta

New Legal & Normative Environment for Accessibility in Europe

2012-11-27:  On Friday last, 23 November 2012, I had the great pleasure of being invited to attend the 2012 IIEA/TEPSA Irish EU Presidency Conference, which was held in Dublin Castle, Ireland.  The Programme was interesting and diverse … but lacked a vital element …

  • Session 1 – Priorities of the Irish EU Presidency ;
  • Session 2 – Economic Governance & Economic Monetary Union ;
  • Session 3 – Innovation & the Digital/Energy Interface ;
  • Session 4 – The European Union in the World.

[ IIEA – Institute of International & European Affairs ] + [ TEPSA – Trans-European Policy Studies Association ]

Colour photograph showing Tánaiste Eamon Gilmore delivering a Keynote Address, from the podium, at the 2012 Dublin IIEA/TEPSA Irish EU Presidency Conference. In the Chair - looking very pensive - is Mr. Dáithí O'Ceallaigh, Director General of the IIEA. Photograph taken by CJ Walsh. 2012-11-23. Click to enlarge.
Colour photograph showing Tánaiste Eamon Gilmore delivering a Keynote Address, from the podium, at the 2012 Dublin IIEA/TEPSA Irish EU Presidency Conference. In the Chair – looking very pensive – is Mr. Dáithí O’Ceallaigh, Director General of the IIEA. Photograph taken by CJ Walsh. 2012-11-23. Click to enlarge.

Although the serious problem of Youth Unemployment in Europe was discussed (from an economic perspective), and the Ageing Society received a passing mention … there was hardly any consideration of EU Citizenship and the many other Soft Social Issues … with, surprise-surprise, no reference at all to the Weak and Vulnerable Groups of People in all of our countries.

Furthermore … I don’t know whether they were invited to the Dublin EU Presidency Conference … and if they were, whether they couldn’t attend … but I did not notice a significant presence of representatives from Irish Disability Organizations at this important event.

Conference Delegates needed to hear that the European Union is for All of its People … not just its Citizens !   That distinction is critical.

Colour photograph showing Delegates at the 2012 IIEA/TEPSA Irish EU Presidency Conference in Dublin - described by one journalist as "a heavyweight audience of policymakers and 'leading thinkers' " - chatting over morning coffee and tea. Notice the lethal-looking metal handrail extensions in the foreground. Photograph taken by CJ Walsh. 2012-11-23. Click to enlarge.
Colour photograph showing Delegates at the 2012 IIEA/TEPSA Irish EU Presidency Conference in Dublin – described by one journalist as “a heavyweight audience of policymakers and ‘leading thinkers’ ” – chatting over morning coffee and tea. Notice the lethal-looking metal handrail extensions in the foreground. Photograph taken by CJ Walsh. 2012-11-23. Click to enlarge.

.

Which sets the scene, in an odd way, for the following e-mail message I recently sent through the EUropean Concept for Accessibility Network (EuCAN) … a network of European Accessibility Experts, co-ordinated from Luxembourg by Mr. Silvio Sagramola …

.

To EuCAN Network Members:

Silvio,

With some concern, I have been following the discussion about Access Officers.

Allow me to explain.

Once upon a time … at a meeting of the EuCAN Management Team in Luxembourg … there was an intense discussion about ‘Accessibility & Human Rights’.  Now that the U.N. Convention on the Rights of Persons with Disabilities has been adopted, entered into force, and been ratified by the European Union and many, though not all, of the EU Member States … I hope that this issue has finally been resolved.

Therefore … the immediate, Pan-European Accessibility Agenda can be found in Articles 9, 11 and 19 of the Convention … all within the context of Preamble Paragraph (g).

BUT … is any organization yet working with this Agenda … and, most importantly, implementing it properly ?

AND … let us not forget that Independent Mechanisms to Monitor Implementation are an essential component of the same Agenda (Article 33.2) … at European, national, and sub-national levels, right down to individual public and private organizations !

.

Accessibility has been clearly specified in the new International Standard ISO 21542: ‘Building Construction – Accessibility & Usability of the Built Environment’ as including … ‘access to buildings, circulation within buildings and their use, egress from buildings in the normal course of events, and evacuation in the event of an emergency‘.

The flawed framework, founded on the term ‘Access’ alone, is now obsolete.  And, therefore, the Access Officer is no more.  Let us all finally agree that the responsible individual, whether he or she, is an Accessibility Officer !

.

If the EuCAN Network is to have a useful and constructive future, this is the New Legal & Normative Environment which it must confront, carefully examine … and, in support of which, it should produce design guidance, decision-making computer software tools, etc., etc … for the practical purpose of ‘real’ implementation.

AND … any proposed EuCAN Programme of Action (2013-2015) should also include a review and updating of past publications.

.

Some Points To Note:

1.     Although the European Union ratified the U.N. CRPD on 23 December 2010 … European Commissioner Viviane Reding (Justice, Fundamental Rights & Citizenship) stated at a Dublin Meeting, in answer to my direct question, that some Member States are offering stiff resistance to integration of the Convention into the EU System.  Why isn’t the European Disability Forum on top of this ?   But also … the European Union has not yet either signed, or ratified, the Convention’s Optional Protocol.

2.     At the time of writing … Finland, Ireland, the Netherlands, and Norway (EEA) … have still not ratified the Convention.  Why not ?   Where is the outcry from disability organizations in those countries ??

In Ireland, unfortunately, national decision-makers would rather commit ritual suicide outside government buildings than acknowledge an individual citizen’s human rights.  And, if Ireland ever does ratify the Convention, proper implementation will be very problematic.

Am I exaggerating ?   Not at all … just look at how Ireland has implemented the U.N. Convention on the Rights of the Child, which it ratified back in September 1992.

3.     In EU Member States that have ratified the U.N. CRPD … the Convention is not always being implemented properly.

Towards the end of the following Blog Post … https://www.cjwalsh.ie/2011/10/public-procurement-design-for-all-its-crunch-time-folks/ … I have discussed the Concluding Observations on the Initial Report of Spain (September 2011 Session of the U.N. Committee on the Rights of Persons with Disabilities).

4.     Preamble Paragraph (g) of the U.N. CRPD is even more important, now, for this reason … the United Nations has started to develop the Post-2015 Sustainable Development Goals.  It is essential to fully integrate Ability/Disability Issues into this process.  Making a submission to the U.N. could be an interesting task for EuCAN.

5.     The Fire Safety Texts contained in ISO 21542 are essentially just a bare minimum … and they are mostly in the form of recommendations (‘should’), not requirements (‘shall’).  There is a great need to add extra detail to those texts … and to convert them into requirements.  Making a series of submissions to the International Standards Organization (ISO) should be a task for EuCAN.

Regards.

C.J. Walsh, Sustainable Design International Ltd. – Ireland, Italy & Turkey.

.

.

EUropean Concept for Accessibility (EuCAN) – Extract from 2001 Mission Statement

The fundamental basis of a European philosophy for accessibility is the recognition, acceptance and fostering – at all levels in society – of the rights of all human beings, including people with activity limitations … in an ensured context of high human health, safety, comfort and environmental protection.  Accessibility for All is an essential attribute of a ‘person-centred’, sustainable built environment.

An Effectively Accessible Europe for All

Now that a Comprehensive Legal and Normative Environment for Accessibility has finally been created in Europe … there is a vital need for EuCAN for serve … and a vital role for EuCAN to play.

However … Concerted Action must be directed at Implementation … Effective Implementation … ‘real’ accessibility which works.

Enough talk – Enough tokenism !!

.

.

END

Enhanced by Zemanta

Sustainable Design International Ltd. – Our Practice Philosophy

2012-10-25:   The Practice Philosophy of Sustainable Design International Ltd. is an issue which has occupied my mind greatly during this past summer … as I asked myself some difficult questions …

What has really been happening to our planet since 1992 … and earlier, since 1972 ?

Where is SDI now ?

Are we on the same track … the right track ?

Where are we going in the short to medium-term future ?

Architecture … is practice as a separate design disciple now obsolete ?

Fire Engineering … can it be dragged, screaming, from the proverbial ‘caves’ … and transformed to respond creatively to the safety and security requirements of a complex built environment ?

Sustainability … what impact does this intricate, open, dynamic and still evolving concept have … should it have … on the provision of conventional Architectural and Fire Engineering Services ?

‘Green’ … is this marketing ploy helpful … or an annoying obstacle … to effective implementation of Sustainable Development ?

.

.

WBCSD's Vision 2050 Poster (2010)World Business Council for Sustainable Development (WBCSD)

Vision 2050: ‘The New Agenda for Business’ (2010)

Click the Link Above to read and/or download a PDF File (3.73 Mb)

.

.

Colour image showing the Tile Page of 'Keeping Track of Our Changing Environment: From Rio to Rio+20 (1992-2012)' ... published in 2011 by the Division of Early Warning and Assessment (DEWA), United Nations Environment Programme (UNEP), Nairobi. Click to enlarge.
Colour image showing the Tile Page of ‘Keeping Track of Our Changing Environment: From Rio to Rio+20 (1992-2012)’ … published in 2011 by the Division of Early Warning and Assessment (DEWA), United Nations Environment Programme (UNEP), Nairobi. Click to enlarge.

2011 – United Nations Environment Programme

Keeping Track of Our Changing Environment: From Rio to Rio+20 (1992-2012)

Click the Link Above to read and/or download a PDF File (4.83 Mb)

Extract from ‘Foreword’ …

This publication serves as a timely update on what has occurred since the Earth Summit of 1992 and is part of the wider Global Environment Outlook-5 (GEO-5) preparations that will lead to the release of the landmark GEO-5 report in May 2012.  It underlines how in just twenty years, the world has changed more than most of us could ever have imagined – geopolitically, economically, socially and environmentally.  Very few individuals outside academic and research communities envisaged the rapid pace of change or foresaw developments such as the phenomenal growth in information and communication technologies, ever-accelerating globalization, private sector investments across the world, and the rapid economic rise of a number of ‘developing’ countries.  Many rapid changes have also taken place in our environment, from the accumulating evidence of climate change and its very visible impacts on our planet, to biodiversity loss and species extinctions, further degradation of land surfaces and the deteriorating quality of oceans.  Certainly, there have been some improvements in the environmental realm, such as the significant reduction in ozone-depleting chemicals and the emergence of renewable energy sources, new investments into which totalled more than $200 thousand million in 2010.  But in too many areas, the environmental dials continue to head into the red.

Achim Steiner, United Nations Under-Secretary-General, and Executive Director, United Nations Environment Programme (UNEP), Nairobi.

.

Sustainable Design International Ltd. – Ireland, Italy & Turkey

[ http://www.sustainable-design.ie/ ] 

SDI Practice Philosophy Explained (October 2012)

Click the Link Above to read and/or download a PDF File (670 Kb)

SDI  is a professional, trans-disciplinary and collaborative design, architectural, fire engineering, research, and consultancy practice … specialists in the theory and practical implementation of a Sustainable Human Environment (social – built – virtual – economic).

WE are committed to … the protection of society, the best interests of our clients, and ‘user’ welfare … not just cost-effective compliance with the Minimal Health & Safety Objectives in Legislation & Codes !

Sustainability … continues to fundamentally transform our Architectural, Fire Engineering & Consultancy Practice.

.

.

2012 Sustainable Society Index - World View at a Glance
Colour image showing the Sustainable Society Index World View for 2012 … presenting the world average scores for 21 Sustainability Performance Indicators. The inner circle of the spider’s web represents a score of 1, meaning no sustainability at all, while the outer ring represents a perfect score of 10 or full sustainability. Click to enlarge.

Sustainable Society Foundation – The Netherlands

.

.

Colour image showing the Tile Page of 'Measuring Progress: Environmental Goals & Gaps' ... published in 2012 by the Division of Early Warning and Assessment (DEWA), United Nations Environment Programme (UNEP), Nairobi. Click to enlarge.
Colour image showing the Tile Page of ‘Measuring Progress: Environmental Goals & Gaps’ … published in 2012 by the Division of Early Warning and Assessment (DEWA), United Nations Environment Programme (UNEP), Nairobi. Click to enlarge.

2012 – United Nations Environment Programme

Measuring Progress: Environmental Goals & Gaps

Click the Link Above to read and/or download a PDF File (4.72 Mb)

‘Foreword’ …

If we measured the world’s response to environmental challenges solely by the number of treaties and agreements that have been adopted, then the situation looks impressive.  Over 500 international environmental agreements have been concluded since 1972, the year of the Stockholm Conference and the establishment of the United Nations Environment Programme (UNEP).

These include landmark conventions on issues such as trade in endangered species, hazardous wastes, climate change, biological diversity and desertification.  Collectively, these reflect an extraordinary effort to install the policies, aims and desires of countries worldwide to achieve sustainable development.

Yet despite the impressive number of legal texts and many good intentions, real progress in solving the environmental challenges themselves has been much less comprehensive, a point clearly underlined in the Global Environment Outlook-5 (GEO-5), for which this report ‘Measuring Progress: Environmental Goals and Gaps’ and a previous publication ‘Keeping Track of Our Changing Environment: From Rio to Rio+20’ are companion products leading up to Rio+20.

This report outlines findings from a UNEP study that, with support from the Government of Switzerland, has catalogued and analyzed existing ‘Global Environmental Goals’ contained in the international agreements and conventions.  It asks the fundamental question as to why the aims and goals of these policy instruments have often fallen far short of their original ambition and intentions.  One possible reason is that many of the goals are simply not specific enough;  the few goals that are specific and measurable appear to have a much better record of success.

These include goals to phase out lead in gasoline, ozone-depleting substances (ODS) and certain persistent organic pollutants (POP’s), specific Millennium Development Goal targets calling to halve the number of people without access to safe drinking water and improved sanitation, and targets to increase the number and extent of protected areas.  Indeed, even when measurable targets have been set but not actually met, they have usually led to positive change and often to significant change.

The vast majority of goals, however, are found to be ‘aspirational’ in nature.  They lack specific targets, which generate obvious difficulties in measuring progress towards them.  In addition, many aspirational goals are not supported by adequate data that can be used to measure progress, global freshwater quality being one stark example.

It is clear that if agreements and conventions are to achieve their intended purpose, the international community needs to consider specific and measurable goals when designing such treaties, while organizing the required data gathering and putting in place proper tracking systems from the outset.

A set of Sustainable Development Goals, as proposed by the UN Secretary-General’s High-Level Panel on Sustainability, could be an excellent opportunity and starting point to improve this situation while representing another positive outcome from Rio+20, two decades after the Rio Earth Summit of 1992 and four decades after the Stockholm Conference.

Achim Steiner, United Nations Under-Secretary-General, and Executive Director, United Nations Environment Programme (UNEP), Nairobi.

.

.

END

Enhanced by Zemanta