2012-01-18:  Progressive Collapse of WTC 7 – 2008 NIST Recommendations – Part 1 of 2 … GROUP 1. Increased Structural Integrity – Recommendation A … and GROUP 2. Enhanced Fire Endurance of Structures – Recommendations B, C, D & E (out of 13)

.

2012-01-22:  SOME PRELIMINARY COMMENTS …

  1.     Keeping my ear closely to the ground … I hear you wondering: “So … how did the fires actually start in World Trade Center Building 7 ?”

Extracts from the Executive Summary (pages xxxi – xxxv) – 2008 NIST NCSTAR 1A …

[ Refer back to the WTC 1 & 2 Collapse Damage Plan in the previous post.]

The fires in WTC Building 7 were ignited as a result of the impact of debris from the collapse of WTC Tower 1, which was approximately 110 metres to the south.  The debris also caused some structural damage to the south-west perimeter of WTC 7.  The fires were ignited on at least 10 floors;  however, only the fires on Floors 7 to 9 and 11 to 13 grew and lasted until the time of building collapse.  These uncontrolled fires had characteristics similar to those that have occurred previously in tall buildings.  Their growth and spread were consistent with ordinary building content fires.  Had a water supply for the automatic sprinkler system been available and had the sprinkler system operated as designed, it is likely that the fires in WTC 7 would have been controlled, and the collapse prevented.  However, the collapse of WTC 7 highlights the importance of designing fire resisting structures for situations where sprinklers are not present, do not function (e.g. due to disconnected or impaired water supply), or are overwhelmed.

and …

There were no serious injuries or fatalities, because the estimated 4,000 occupants of WTC 7 reacted to the airplane impacts on the two WTC Towers and began evacuating before there was significant damage to WTC 7.  The occupants were able to use both the elevators and the stairs, which were as yet not damaged, obstructed, or smoke-filled.  Evacuation of the building took just over an hour.  The potential for injuries to people leaving the building was mitigated by building management personnel holding the occupants in the lobby until they identified an exit path that was safe from the debris falling from WTC Tower 1.  The decisions not to continue evaluating the building and not to fight the fires were made hours before the building collapsed, so no emergency responders were in or near the building when the collapse occurred.

and …

The design of WTC 7 was generally consistent with the New York City Building Code of 1968 (NYCBC), with which, by policy, it was to comply.  The installed thickness of the thermal insulation on the floor beams was below that required for unsprinklered or sprinklered buildings, but it is unlikely that the collapse of WTC 7 could have been prevented even if the thickness had been consistent with building code requirements.  The stairwells were narrower than those required by the NYCBC, but, combined with the elevators, were adequate for a timely evacuation on 11 September 2001, since the number of building occupants was only about half that expected during normal business hours.

The collapse of WTC 7 could not have been prevented without controlling the fires before most of the combustible building contents were consumed.  There were two sources of water (gravity-fed overhead tanks and the city water main) for the standpipe and automatic sprinkler systems serving Floor 21 and above, and some of the early fires on those upper floors might have actually been controlled in this manner.  However, consistent with the NYCBC, both the primary and back-up source of water for the sprinkler system in the lower 20 floors of WTC 7 was the city water main.  Since the collapses of the WTC Towers had damaged the water main, there was no water available (such as the gravity-fed overhead tanks that supplied water to Floor 21 and above) to control those fires that eventually led to the building collapse.

Link to read and/or download a copy of the 2008 NIST NCSTAR 1A Report … www.fireox-international.eu/fire/structdesfire.htm 

.

  2.     On a separate subject and quite by chance … a few days ago, I was invited to review a technical paper for a reputable international fire engineering journal (which shall remain nameless).  The paper was discussing a certain aspect of steel column critical temperatures.  After three days, I replied to the journal’s editor as follows …

2012-01-18.

Most regrettably, I must decline your invitation to review Paper XYZ.

The ‘critical temperature’ approach to the fire engineering design of steel-framed structures is deeply flawed … and obsolete.

C. J. Walsh, FireOx International – Ireland, Italy & Turkey.

The ‘critical temperature’ approach is antiquated … and this nonsense has got to stop !   NOW … would be the best time !!

.

  3.     In the last post, I wrote …

Structural Fire Engineering is concerned with those aspects of fire engineering which relate to structural design for fire, and the complex architectural interaction between a building’s structure and fabric, i.e. non-structure, under conditions of fire and its immediate aftermath.

Indeed !   But, more needs to be added …

I hope it is becoming clearer now that Structural Fire Engineering is not just ambient structural engineering with a few extra ‘bells and whistles’ grafted on … in token consideration of what could happen in fire conditions, i.e. at high temperatures.

[ If, in some jurisdictions, there are no legal requirements to add even those ‘bells and whistles’ … then, typically, even they will be omitted ! ]

This brings me right back to the typical education of Civil/Structural Engineers;  because:  (i) they exit the educational system with little understanding of anything beyond ‘structure’ … in other words, a ‘real’ building, which also comprises ‘fabric’, i.e. non-structure, is a mystery to them;  and (ii) they have difficulty reading architectural drawings … which is why a walk-through inspection of a building, as it is nearing completion, is much preferred over a detailed discussion about drawings at the most appropriate stage, which is well before construction commences … when faults can be readily identified and easily rectified !

In ambient conditions … the architectural interaction between a building’s structure and fabric is difficult, not being entirely static.  Before the surface finishes have been applied, it is immediately obvious when this interaction has been properly ‘designed’, and looks neat and tidy … or, on the vast majority of construction sites, when this interaction is a ‘traffic accident’, and the results are desperately ugly … and you know that they can’t apply the surface finishes quickly enough in order to hide everything from view !

In fire conditions … this architectural interaction between building fabric and structure is complex, certainly very dynamic … and fluid !

It would be more appropriate to think of Structural Fire Engineering as ‘Design in the Hot Form’ … which is a completely different mindset.

It is essential, therefore, that Fire Engineers understand ‘real’ buildings … most importantly, the ‘design’ of real buildings … and, that they know which end is ‘up’ on a real construction site !!   See NIST WTC 7 Recommendation L below.

.

  4.     Since the collapse of WTC Building 7 on 11 September 2001, it has been generally assumed that Fire-Induced Progressive Collapse is a large-scale, macro-phenomenon only.  But, believe it or not, this phenomenon has also been observed at micro-level in small building types.

In fact … Progressive Collapse was already receiving sporadic attention, in Ireland, as far back as the 1980’s …

  • As organizer of the 1987 Dublin International Fire Conference: ‘Fire, Access & Safety in Residential Buildings’, I requested that the following Paper be presented … ‘Design against Progressive Collapse in Fire’ … by Dr. Willie Crowe, who was Head of Construction Technology, in the old Institute for Industrial Research & Standards (IIRS) in Ireland.  He later became Manager of the Irish Agrément Board (IAB).  Those were the days … and Willie really knew his stuff !

Mr. Noel C. Manning, of FireBar in Ireland (www.firebar.ie),  and I both contributed to the development of his Paper.

And now is as good a time as any to give full credit to Noel Manning for his innovative approach to Structural Fire Engineering back in the early 1980’s.  He’s a ‘hard man’ … a term that we use for some special people in Ireland !

Link to the Dublin International Fire Conferences, and a copy of this Paper … www.fireox-international.eu/fire/dublinfire.htm 

  • For approximately 12 years from the mid-1980’s, I was a Member of the National Masonry Panel – the National Standards Authority of Ireland (NSAI) Masonry Standards Advisory Committee.  A small, but substantial, text on Fire-Induced Progressive Collapse in Buildings was included, by me, in the following standard … Irish Standard 325: Code of Practice for Use in Masonry – Part 2: Masonry Construction (1995).  Appendix A – Determination of Movement in Masonry.  A.3 – Thermal Movement.  Once again … those were the days … when I was the only architect in a sea of engineers !!   Not a pretty experience.

.

  5.     What next ?   A final draft of the International CIB W14 Research WG IV Reflection Document on Fire-Induced Progressive Collapse will be completed in time for circulation to all CIB W14 members before the end of March 2012 … well in time for the next CIB W14 Meetings in Greece, near the end of April 2012.

.

2008 NIST WTC 7 RECOMMENDATIONS  (Final Report NCSTAR 1A)

5.1.3     GROUP 3.  New Methods for Fire Resisting Design of Structures

The procedures and practices used in the fire resisting design of structures should be enhanced by requiring an objective that uncontrolled fires result in burnout without partial or global (total) collapse.  Performance-based methods are an alternative to prescriptive design methods.  This effort should include the development and evaluation of new fire resisting coating materials and technologies, and evaluation of the fire performance of conventional and high-performance structural materials.

NIST WTC 7 Recommendation F  (NCSTAR 1  Recommendation 8).

NIST recommends that the fire resistance of structures be enhanced by requiring a performance objective that uncontrolled building fires result in burnout without partial or global (total) collapse.  Such a provision should recognize that sprinklers could be compromised, non-operational, or non-existent.  Current methods for determining the fire resistance of structural assemblies do not explicitly specify a performance objective.  The rating resulting from current test methods indicates that the assembly (component or sub-system) continued to support its superimposed load (simulating a maximum load condition) during the test exposure without collapse.  Model Building Codes:  This Recommendation should be included in the national model building codes as an objective, and adopted as an integral pert of the fire resistance design for structures.  The issue of non-operational sprinklers could be addressed using the existing concept of Design Scenario 8 of NFPA 5000, where such compromise is assumed and the result is required to be acceptable to the Authority Having Jurisdiction (AHJ).  Affected Standards:  ASCE-7, AISC Specifications, ACI 318, and ASCE/SFPE 29.

Relevance to WTC 7:  Large, uncontrolled fires led to failure of a critical column and consequently the complete collapse of WTC 7.  In the region of the collapse initiation (i.e. on the east side of Floor 13), the fire had consumed virtually all of the combustible building contents, yet collapse was not prevented.

.

NIST WTC 7 Recommendation G  (NCSTAR 1  Recommendation 9).

NIST recommends the development of:  (1) performance-based standards and code provisions, as an alternative to current prescriptive design methods, to enable the design and retrofit of structures to resist real building fire conditions, including their ability to achieve the performance objective of burnout without structural or local fire collapse;  and (2) the tools, guidelines, and test methods necessary to evaluate the fire performance of the structure as a whole system.  Standards development organizations, including the American Institute of Steel Construction, have already begun developing performance-based provisions to consider the effects of fire in structural design.

a.     Standard methodology, supported by performance criteria, analytical design tools, and practical design guidance;  related building standards and codes for fire resistance design and retrofit of structures, working through the consensus process for nationwide adoption;  comprehensive design rules and guidelines;  methodology for evaluating thermo-structural performance of structures;  and computational models and analysis procedures for use in routine design practice.

b.     Standard methodology for specifying multi-compartment, multi-floor fire scenarios for use in the design and analysis of structures to resist fires, accounting for building-specific conditions such as geometry, compartmentation, fuel load (e.g. building contents and any flammable fuels such as oil and gas), fire spread, and ventilation;  and methodology for rating the fire resistance of structural systems and barriers under realistic design-basis fire scenarios.

c.     Publicly available computational software to predict the effects of fires in buildings – developed, validated, and maintained through a national effort – for use in the design of fire protection systems and the analysis of building response to fires.  Improvements should include the fire behaviour and contribution of real combustibles;  the performance of openings, including door openings and window breakage, that controls the amount of oxygen available to support the growth and spread of fires and whether the fire is fuel-controlled or ventilation-controlled;  the floor-to-floor flame spread;  the temperature rise in both insulated and un-insulated structural members and fire barriers;  and the structural response of components, sub-systems, and the total building system due to the fire.

d.     Temperature-dependent thermal and mechanical property data for conventional and innovative construction materials.

e.     New test methods, together with associated conformance assessment criteria, to support the performance-based methods for fire resistance design and retrofit of structures.  The performance objective of burnout without collapse will require the development of standard fire exposures that differ from those currently used.

There is a critical gap in knowledge about how structures perform in real fires, particularly concerning: the effects of fire on the entire structural system (including thermal expansion effects at lower temperatures);  interaction between the sub-systems, elements, and connections;  and scaling of fire test results to full-scale structures (especially for structures with long-span floor systems).

Relevance to WTC 7:  A performance-based assessment of the effects of fire on WTC 7, had it considered all of the relevant thermal effects (e.g. thermal expansion effects that occur at lower temperatures), would have identified the vulnerability of the building to fire-induced progressive collapse and allowed alternative designs for the structural system.

.

5.1.4     GROUP 4.  Improved Active Fire Protection

Active fire protection systems (i.e. sprinklers, standpipes/hoses, fire alarms, and smoke management systems) should be enhanced through improvements to the design, performance, reliability, and redundancy of such systems.

NIST WTC 7 Recommendation H  (NCSTAR 1  Recommendation 12).

NIST recommends that the performance, and possibly the redundancy and reliability of active fire protection systems (sprinklers, standpipes/hoses, fire alarms, and smoke management systems), in buildings be enhanced to accommodate the greater risks associated with increasing building height and population, increased use of open spaces, high-risk building activities, fire department response limits, transient fuel loads, and higher threat profile.

Reliability is affected by (a) redundancy, such that when one water supply is out of service (usually for maintenance), the other interconnected water supply can continue to protect the building and its occupants;  (b) automatic operation of water supply systems (not only for starting fire pumps but also for testing and tank replenishment, with appropriate remote alarms to the fire department and local alarms for notifying emergency personnel);  and (c) the use of suitable equipment and techniques to regulate unusual pressure considerations.

Relevance to WTC 7:  No water was available for the automatic suppression systems on the lower 20 storeys of WTC 7, once water from street-level mains was disrupted.  This lack of reliability in the source of the primary and secondary water supplies allowed the growth and spread of fires that ultimately resulted in collapse of the building.

.

5.1.5     GROUP 6.  Improved Emergency Response

Technologies and procedures for emergency response should be improved to enable better access to buildings, response operations, emergency communications, and command and control in large-scale emergencies.

NIST WTC 7 Recommendation I  (NCSTAR 1  Recommendation 24).

NIST recommends the establishment and implementation of codes and protocols for ensuring effective and uninterrupted operation of the command and control system for large-scale building emergencies.

a.     State, local, and federal jurisdictions should implement the National Incident Management System (NIMS).  The jurisdictions should work with the Department of Homeland Security to review, test, evaluate, and implement an effective unified command and control system.  NIMS addresses interagency co-ordination and establishes a response matrix – assigning lead agency responsibilities for different types of emergencies, and functions.  At a minimum, each supporting agency should assign an individual to provide co-ordination with the lead agency at each incident command post.

b.     State, local, and federal emergency operations centres (EOC’s) should be located, designed, built, and operated with security and operational integrity as a key consideration.

c.     Command posts should be established outside the potential collapse footprint of any building which shows evidence of large multi-floor fires or has serious structural damage.  A continuous assessment of building stability and safety should be made in such emergencies to guide ongoing operations and enhance emergency responder safety.  The information necessary to make these assessments should be made available to those assigned responsibility (see related Recommendations 15 and 23 in NIST NCSTAR 1).

d.     An effective command system should be established and operating before a large number of emergency responders and apparatus are dispatched and deployed.  Through training and drills, emergency responders and ambulances should be required to await dispatch requests from the incident command system and not to self-dispatch in large-scale emergencies.

e.     Actions should be taken via training and drills to ensure a co-ordinated and effective emergency response at all levels of the incident command chain by requiring all emergency responders that are given an assignment to immediately adopt and execute the assignment objectives.

f.     Command post information and incident operations data should be managed and broadcast to command and control centres at remote locations so that information is secure and accessible by all personnel needing the information.  Methods should be developed and implemented so that any information that is available at an interior information centre is transmitted to an emergency responder vehicle or command post outside the building.

Relevance to WTC 7:  (1) The New York City Office of Emergency Management (OEM) was located in WTC 7 and was evacuated before key fire ground decisions had to be made.  The location of OEM in WTC 7, which collapsed due to ordinary building fires, contributed to the loss of robust interagency command and control on 11 September 2001.  (2) Due to the collapse of the WTC Towers and the loss of responders and fire control resources, there was an evolving site leadership during the morning and afternoon.  Key decisions (e.g. not to fight the fires in WTC 7 and to turn off power to the Con Edison substation) were reasonable and would not have changed the outcome on 11 September 2001, but were not made promptly.  Under different circumstances (e.g. if WTC 7 had collapsed sooner and firefighters were still evaluating the building condition), the outcome could have been very different.

.

5.1.6     GROUP 7.  Improved Procedures and Practices

The procedures and practices used in the design, construction, maintenance, and operation of buildings should be improved to include encouraging code compliance by non-governmental and quasi-governmental entities, adoption and application of evacuation and sprinkler requirements in codes for existing buildings, and retention and availability of building documents over the life of a building.

NIST WTC 7 Recommendation J  (NCSTAR 1  Recommendation 27).

NIST recommends that building codes incorporate a provision that requires building owners to retain documents, including supporting calculations and test data, related to building design, construction, maintenance, and modifications over the entire life of the building.*  Means should be developed for off-site storage and maintenance of the documents.  In addition, NIST recommends that relevant information be made available in suitably designed hard copy or electronic formats for use by emergency responders.  Such information should be easily accessible by responders during emergencies.

[ * F-12  The availability of inexpensive electronic storage media and tools for creating large searchable databases makes this feasible.]

Relevance to WTC 7:  The efforts required in locating and acquiring drawings, specifications, tenant layouts, and material certifications, and especially shop fabrication drawings, significantly lengthened the investigation into the collapse of WTC 7.

.

NIST WTC 7 Recommendation K  (NCSTAR 1  Recommendation 28).

NIST recommends that the role of the ‘Design Professional in Responsible Charge’* be clarified to ensure that:  (1) all appropriate design professionals (including, e.g. the fire protection engineer) are part of the design team providing the highest standard of care when designing buildings employing innovative or unusual fire safety systems;  and (2) all appropriate design professionals (including, e.g. the structural engineer and the fire protection engineer) are part of the design team providing the highest standard of care when designing the structure to resist fires, in buildings that employ innovative or unusual structural and fire safety systems.

[ * F-13  In projects involving a design team, the ‘Design Professional in Responsible Charge’ – usually the lead architect – ensures that the team members use consistent design data and assumptions, co-ordinates overlapping specifications, and serves as the liaison between the enforcement and reviewing officials and the owner.  This term is defined in the International Building Code (IBC) and in the International Code Council’s Performance Code for Buildings and Facilities (where it is the Principal Design Professional).]

Relevance to WTC 7:  Following typical practice, none of the design professionals in charge of the WTC 7 Project (i.e. architect – structural engineer – fire protection engineer) was assigned the responsibility to explicitly evaluate the fire performance of the structural system.  Holistic consideration of thermal and structural factors during the design or review stage could have identified the potential for the failure and might have prevented the collapse of the building.

.

5.1.7     GROUP 8.  Education and Training

The professional skills of building and fire safety professionals should be upgraded through a national education and training effort for fire protection engineers, structural engineers, and architects.  The skills of building regulatory and fire service personnel should also be upgraded to provide sufficient understanding and the necessary skills to conduct the review, inspection, and approval tasks for which they are responsible.

NIST WTC 7 Recommendation L  (NCSTAR 1  Recommendation 29).

NIST recommends that continuing education curricula be developed, and programmes be implemented for:  (1) training fire protection engineers and architects in structural engineering principles and design;  and (2) training structural engineers, architects, fire protection engineers, and code enforcement officials in modern fire protection principles and technologies, including the fire resisting design of structures;  and (3) training building regulatory and fire service personnel to upgrade their understanding and skills to conduct the review, inspection, and approval tasks for which they are responsible.  The outcome would further the integration of the disciplines in effective fire-safe design of buildings.

Relevance to WTC 7:  Discerning the fire-structure interactions that led to the collapse of WTC 7 required research professionals with expertise in both disciplines.  Assuring the safety of future buildings will require that participants in the design and review processes possess a combined knowledge of fire science, materials science, heat transfer, and structural engineering, and design.

.

NIST WTC 7 Recommendation M  (NCSTAR 1  Recommendation 30).

NIST recommends that academic, professional short-course, and web-based training materials in the use of computational fire dynamics and thermo-structural analysis tools be developed and delivered to strengthen the base of available technical capabilities and human resources.

Relevance to WTC 7:  NIST stretched the state-of-the-art in the computational tools needed to reconstruct a fire-induced progressive collapse.  This enabled identification of the critical processes that led to that collapse.  Making these expanded tools and derivative, validated, and simplified modelling approaches usable by practitioners could prevent future disasters.

.

.

END

Enhanced by Zemanta

Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

NIST WTC Recommendations 25-28 > Improved Practices

Previous Posts in This Series …

2011-10-25:  NIST’s Recommendations on the 9-11 WTC Building Collapses … GROUP 1. Increased Structural Integrity – Recommendations 1, 2 & 3 (out of 30)

2011-11-18:  NIST WTC Recommendations 4-7 > Structural Fire EnduranceGROUP 2.  Enhanced Fire Endurance of Structures – Recommendations 4, 5, 6 & 7

2011-11-24:  NIST WTC Recommendations 8-11 > New Design of StructuresGROUP 3.  New Methods for Fire Resisting Design of Structures – Recommendations 8, 9, 10 & 11

2011-11-25:  NIST WTC Recommendations 12-15 > Improved Active ProtectionGROUP 4.  Improved Active Fire Protection – Recommendations 12, 13, 14 & 15

2011-11-30:  NIST Recommendations 16-20 > Improved People EvacuationGROUP 5.  Improved Building Evacuation – Recommendations 16, 17, 18, 19 & 20

2011-12-04:  NIST WTC Recommendations 21-24 > Improved FirefightingGROUP 6.  Improved Emergency Response – Recommendations 21, 22, 23 & 24

.

2011-12-07:  SOME PRELIMINARY COMMENTS …

  1.     Concerning Recommendation 25 below … yes, this Recommendation applies to the types of organizations identified in the text, but it should also be understood as applying to ALL Organizations … public or private, governmental or non-governmental or quasi-governmental, whatever, etc … ‘supported’ (see the text further down in Recommendation 25) with rigorous enforcement, in all cases, by publically appointed building control officials and/or by private, independent, competent technical control professionals.

Once more … and again and again (!) … confirmed by the sort of debacle seen at the Priory Hall Apartment Complex, in Dublin … Self-Certification / Self-Approval, i.e. ‘lite’ regulation, does not work.  For National Authorities Having Jurisdiction (AHJ’s), however, it is a cheap solution to a difficult, resource-devouring issue, i.e. protecting society and the consumer … in that order.

  2.     Concerning the Footnote to Recommendation 26 below … the choice should never be between either Fire Compartmentation or Sprinklers … or the other way around, whichever you prefer.  Neither is 100% reliable !

Fire Compartmentation

The division of a building into fire-tight compartments, by fire and smoke resisting elements of construction, in order …

  • to contain an outbreak of fire, and to facilitate effective firefighting ;
  • to prevent damage, within the building, to other adjoining compartments and/or spaces ;
  • to protect a compartment interior from external fire attack, e.g. fire spread across the building’s facade or from an adjacent building ;
  • to minimize adverse, or harmful, environmental impacts outside the building.

As developed as that definition is above, Fire Compartmentation should be regarded as just one Fire Safety Strategy / Fire Engineering Strategy … not the only strategy, and certainly not the main strategy.

Here are two reasons why not …

a)   The connection between compartment size and the ability to effectively fight a fire within a space of limited volume has been lost … so more and more, commercial pressure is being exerted on national authorities to expand the acceptable compartment sizes in buildings … which significantly increases the fire hazard ;

[ Remembering the difference between the limited Fire Safety Objectives of Building Codes/Regulations and the much broader Project-Specific Fire Engineering Objectives of Ethical Fire Engineering required to protect society and the full interests of our clients … it is easy to understand why national authorities feel that they can respond positively to such commercial pressures.]

b)   In a Sustainable Building … it is a very common design strategy to take advantage of the natural patterns of air movement in a building, for either cooling or heating purposes, depending on local climate conditions.  So there is simply no compartmentation, as understood in conventional fire engineering terms … and this throws up a fundamental conflict between the two.  To be discussed in another post !

  3.     Concerning the 2nd Footnote to Recommendation 28 below … in the very same New York City … at 09.40 hrs on a Saturday morning, 28 July 1945 … lost in fog, a B-25 Bomber slammed head-on into the 79th Floor of the Empire State Building … and caused enormous damage.  That building is still standing today … and surprise, surprise … there was aviation fuel in the B-25 !

In a similar vein … Fire-Induced Progressive Collapse was not observed for the first time, in New York, on 11 September 2001 !

.

2005 NIST WTC RECOMMENDATIONS

GROUP 7.  Improved Procedures and Practices

The procedures and practices used in the design, construction, maintenance, and operation of buildings should be improved to include encouraging code compliance by non-governmental and quasi-governmental entities, adoption and application of egress and sprinkler requirements in codes for existing buildings, and retention and availability of building documents over the life of a building.

NIST WTC Recommendation 25.

Non-governmental and quasi-governmental entities that own or lease buildings and are not subject to building and fire safety code requirements of any governmental jurisdiction are nevertheless concerned about the safety of building occupants and responding emergency personnel.  NIST recommends that such entities be encouraged to provide a level of safety that equals or exceeds the level of safety that would be provided by strict compliance with the code requirements of an appropriate governmental jurisdiction.  NIST further recommends that as-designed and as-built safety be certified by a qualified third party, independent of the building owner(s).  The process should not use self-approval for code enforcement in areas including interpretation of code provisions, design approval, product acceptance, certification of the final construction, and post-occupancy inspections over the life of the buildings.*

[ * F-46  The long-standing stated policy of the Port Authority of New York & New Jersey (PANYNJ) was to meet and, where appropriate, exceed the requirements of local building and fire codes, and it entered into agreements with the New York City Department of Buildings and the Fire Department of the City of New York in accordance with that policy.  Although the PANYNJ sought review and concurrence from New York City in the areas listed in the Recommendation, the PANYNJ was not required to yield, and appears not to have yielded, approval authority to New York City.  The PANYNJ was created as an interstate entity, a ‘body corporate and politic’, under its charter, pursuant to Article 1, Section 10 of the United States Constitution permitting compacts between states.  Further, there are many other similar non-governmental and quasi-governmental entities in the U.S.  A comprehensive review of documents conducted as part of this Investigation suggests that the WTC towers generally were designed and maintained consistent with the requirements of the 1968 New York City Building Code.  Areas of concern included fireproofing of the WTC floor system, height of tenant separation walls, and egress requirements for the assembly use spaces of ‘Windows of the World’ in WTC Tower 1 and the ‘Top of the World’ Observation Deck in WTC Tower 2.  These areas of concern did not play a significant role in determining the outcomes related to the events on 11th September 2001.]

NIST WTC Recommendation 26.

NIST recommends that state and local jurisdictions adopt and aggressively enforce available provisions in building codes to ensure that egress and sprinkler requirements are met by existing buildings.*  Further, occupancy requirements should be modified where needed (such as when there are assembly use spaces within an office building) to meet the requirements in model building codes.  Provisions related to egress and sprinkler requirements in existing buildings are available in such codes as the International Existing Building Code (IEBC), International Fire Code, NFPA 1, NFPA 101, and ASME A 17.3.  For example, the IEBC defines three levels of building alteration (removal and replacement or covering of existing materials and equipment, reconfiguration of space or system or installation of new equipment, and extending the work area in excess of 50% of the aggregate area of the building).  At the lowest level, there are no upgrade implications for sprinklers and the egress system.  At the next level, sprinklers are required in work areas serving greater than 30 people if certain other conditions related to building height and use such as shared exits also are met.  There are numerous requirements for means of egress, including number of exits, specification of doorsets, dead-end corridors and travel distances, lighting, signage, and handrails.  At the highest level, the sprinkler and egress requirements are identical to the second level without the minimum 30-person restriction and the other conditions related to building height and use.  The Life Safety Code (NFPA 101) applies retroactively to all buildings, independent of whether any work is currently being done on the building, and ASME A 17.3 applies retroactively to all elevators as a minimum set of requirements.

[ * F-47  The WTC towers were unsprinklered when built.  It took nearly 28 years after passage of New York City Local Law 5 in 1973, which required either compartmentation or sprinklering, for the buildings to be fully sprinklered (the Port Authority chose not to use the compartmentation option in Local Law 5).  This was about 13 years more than the 15-year period for full compliance with Local Law 5 that was set by Local Law 84 of 1979.]

NIST WTC Recommendation 27.

NIST recommends that building codes incorporate a provision that requires building owners to retain documents, including supporting calculations and test data, related to building design, construction, maintenance, and modifications over the entire life of the building.*  Means should be developed for off-site storage and maintenance of the documents.  In addition, NIST recommends that relevant information be made available in suitably designed hard copy or electronic formats for use by emergency responders.  Such information should be easily accessible by responders during emergencies.  Model Building Codes:  Model building codes should incorporate this Recommendation.  State and local jurisdictions should adopt and enforce these requirements.

[ * F-48  The availability of inexpensive electronic storage media and tools for creating large searchable databases makes this feasible.]

NIST WTC Recommendation 28.

NIST recommends that the role of the ‘Design Professional in Responsible Charge’* be clarified to ensure that:  (1) all appropriate design professionals (including, e.g. the fire protection engineer) are part of the design team providing the highest standard of care when designing buildings employing innovative or unusual fire safety systems;**  and (2) all appropriate design professionals (including, e.g. the structural engineer and the fire protection engineer) are part of the design team providing the highest standard of care when designing the structure to resist fires, in buildings that employ innovative or unusual structural and fire safety systems.  Affected Standards:  AIA Practice Guidelines.  Model Building Codes:  The International Building Code (IBC), which already defines ‘Design Professional in Responsible Charge’, should be clarified to address this Recommendation.  NFPA 5000 should incorporate the ‘Design Professional in Responsible Charge’ concept, and address this Recommendation.

[ * F-49  In projects involving a design team, the ‘Design Professional in Responsible Charge’ – usually the lead architect – ensures that the team members use consistent design data and assumptions, co-ordinates overlapping specifications, and serves as the liaison between the enforcement and reviewing officials and the owner.  This term is defined in the International Building Code (IBC) and in the International Code Council’s Performance Code for Buildings and Facilities (where it is the Principal Design Professional).]

[ ** F-50  If the fire safety concepts in tall buildings had been sufficiently mature in the 1960’s, it is possible that the risks associated with jet-fuel ignited multi-floor fires might have been recognized and taken into account when the impact of a Boeing 707 aircraft was considered by the structural engineer during the design of the WTC towers.]

.

.

END

Enhanced by Zemanta

Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Search

 

Follow SFE2016Dublin on Twitter

December 2019
S M T W T F S
« Nov    
1234567
891011121314
15161718192021
22232425262728
293031  

Links