BATIMAT Building Exhibition in Paris (2-7 November 2009)

2009-10-18:  Here we are, once again, approaching November 2009.  Two years have rolled by … far too quickly … since the last Paris BATIMAT Exhibition in 2007.

Compared to what we are used to in Ireland, the BATIMAT Exhibition is huge … taking at least 3-4 days in order to see everything half-decently !

Annotated, colour image showing the 2009 Paris BATIMAT Exhibition Site Layout and general information about dates (2-7 November), opening times (every morning, from 09.00 hrs), etc. Click to enlarge. Extract from Official Exhibition Catalogue.
Annotated, colour image showing the 2009 Paris BATIMAT Exhibition Site Layout and general information about dates (2-7 November), opening times (every morning, from 09.00 hrs), etc. Click to enlarge. Extract from Official Exhibition Catalogue.

 

I have been going there for many years … to spot new trends, discover innovative building products and systems … and meet up with friends from CSTB or CTICM.  In a good year, I would expect to find at least 7-8 good new ideas …

Colour photograph showing an exterior view looking up the main avenue towards Pavillon (Hall) 7. Click to enlarge. Photograph taken by CJ Walsh. 2001-11-09.
Colour photograph showing an exterior view looking up the main avenue towards Pavillon (Hall) 7. Click to enlarge. Photograph taken by CJ Walsh. 2001-11-09.

When I first enter the Exhibition, I usually become emotional … almost close to tears … with FRUSTRATION (!) … not at the enormous scale of the event … but because so much on view never appears in the Irish Construction Product Marketplace … and if they do appear, it is not until many years later.  I kid you not !   There are reasons … but, that is a discussion for another day …

Colour photograph showing an interior view looking over Pavillon (Hall) 1. Click to enlarge. Photograph taken by CJ Walsh. 2001-11-09.
Colour photograph showing an interior view looking over Pavillon (Hall) 1. Click to enlarge. Photograph taken by CJ Walsh. 2001-11-09.

I wonder if the Current Recession in the European Construction Sector will have an adverse impact on this year’s exhibition …

.

.

END

Enhanced by Zemanta

Disability Access Certificates (DAC’s) – A Time to Worry ? (I)

2009-10-17:  Some of you are already hitting the Internet Search Engines … with fierce intent altogether … about  Disability Access Certificates (DAC’s) !

Is it Time to Panic ?   No.

For a simple and direct hit, the 2 most relevant Irish Legal Instruments are:

1.  Statutory Instrument No. 352 of 2009 – Building Control Act 2007 (Commencement) Order 2009.

This states …

” The 30 September 2009 is appointed as the day on which the provisions of Sections 5 and 6 of the Building Control Act 2007 shall come into operation.”

Section 5 covers the Amendment of Section 6 (Building Control Regulations) of the Building Control Act 1990.

Section 6 covers the Amendment of Section 7 (Appeals) of the Building Control Act 1990.

2.  Statutory Instrument No. 351 of 2009 – Building Control (Amendment) Regulations 2009.

This states …

” These Regulations shall come into effect on 1 October 2009, except for the provisions of Article 8 which shall come into effect on 1 January 2009.”

Article 8 covers Disability Access Certificates and Revised Disability Access Certificates.

For you, yourself, to properly examine all of the ‘ins and outs’ of this New Certification Scheme … download the PDF File below … and then search the document (making sure that it is not case-sensitive !) using the phrase ‘Disability Access Certificate’.  You will find 99 instances where the phrase is used.

Enjoy !

Ireland: Statutory Instrument No. 351 of 2009 – Building Control (Amendment) Regulations 2009

Click the Link above to read/download PDF File (223 Kb)

In order to make full sense of all that is happening, and is intended to happen in the not too distant future … there are a few other Legal Instruments, related to the two listed, which also need to be consulted … but that is an exercise meant for masochists !

In comparison, the European Union Lisbon Treaty was a sweet bedtime story !   Seriously !!

.

Is it Time to Worry ?   Yes.

Here are just a few random ideas for your cogitation …

  • If the Department of the Environment, Heritage & Local Government (DEHLG) pays little heed to Submissions made during and after this summer’s ‘consultation’ process … the proposed New Technical Guidance Document M: ‘Access & Use’ will end up looking like a real dog’s dinner of an absolute mess !   FUBAR.

Years were spent in the preparation of the New TGD M.  When it does eventually appear, it will be an accurate reflection of technical capacities within both the Department and the National Disability Authority (NDA).

Deeply regretted is the absence of Mr. Kevin Spencer … a gentle soul … from the DEHLG.  Things have not been the same since his departure.  He knew what he was talking about.

  • Who will deal, at a technical level, with Applications for Disability Access Certificates in the Local Authorities ?   Will they be competent to do so ?   Will their interpretation of the Part M Legal Requirements be harmonized … not just with other/different Authorities … but even with other technical personnel in the same Authority ???
  • In order to make this new certification scheme work, will the Guidance Text in Technical Guidance Document M (whatever version appears !) be operated as if it were Prescriptive Regulation … which will be totally illegal ?

This has been exactly the story … for many years … with the Guidance Text in Technical Guidance Document B … in the course of operation of the Fire Safety Certification Scheme.  FUBAR.

  • If, as I hinted above, the proposed New Technical Guidance Document M: ‘Access & Use’ will be a real dog’s dinner of a mess … falling far short of what can now be reasonably described as minimal accessibility performance (see the Draft International Accessibility-for-All Standard ISO 21542) … this will certainly open Building Owners/Managers of newly completed buildings to Complaints under Irish Equality Legislation.  Why is the Disability Sector so inactive with regard to making complaints ?

and finally …

  • Are the relevant Irish Decision Makers, as I suggested might happen in a previous post, in the process of actually sleepwalking into an unquestioned acceptance of the inadequate British Standards BS 9999 : 2008 and BS 8300 : 2009 ???   Do they know how to do anything else ?

 

For some sublime moments of meditation, however, please chew on the information provided at these Pages on the SDI Support WebSite

Disability Rights & Removing Physical Restrictions on Participation in Society ;

Towards a Sustainable Social Environment, Accessibility-for-All & Facilitation Design (2001 WHO ICF) ;

Fire Evacuation-for-All & Principles of Fire Engineering.

.

.

END

Enhanced by Zemanta

Buildings of Historical, Architectural & Cultural Importance !

2009-10-08:  Deeply interested … and ‘luuuving’ … a hands-on and direct involvement in the Sustainable Restoration of Buildings which are of Historical, Architectural or Cultural Importance … or even those buildings which are not so important … I am deeply frustrated and angry when I look around at what has happened … and continues to happen … in Ireland … horrible, damaging interventions and alterations of all kinds … too many of which cannot be undone.

Certain guru-like organizations and individuals must be robustly challenged !

Yes … in everyday practice, there are pressures concerning an improvement of energy performance (BER Certificates !) … an improvement of accessibility performance for people with activity limitations (2001 WHO ICF) … an improvement of fire safety performance, etc., etc. … and, in the next few short years, adaptation to climate change will require serious attention.

BUT – BUT – BUT … in dealing with these buildings (a priceless heritage for our children, and their children, which cannot be replaced !) … some absolutely core principles must influence the minds of decision-makers in client and construction organizations, national authorities having jurisdiction, regulators … and, most importantly, the minds and souls of architects and engineers.  (I am wondering … do engineers have souls ?)

.

ICOMOSInternational Council on Monuments & Sites / Conseil International des Monuments et des Sites – works for the conservation and protection of cultural heritage places and is the only global, non-governmental organization of its kind.  It is dedicated to promoting the application of theory, methodology, and scientific techniques to the conservation of the architectural and archaeological heritage.  Its work is based on the principles enshrined in the 1964 International Charter on the Conservation and Restoration of Monuments and Sites (Venice Charter).

From practical experience, I have found the 16 Principles of the 1964 Venice Charter to be enormously helpful …

ARTICLE 1    The concept of an historic monument embraces not only the single architectural work but also the urban or rural setting in which is found the evidence of a particular civilization, a significant development or an historic event.  This applies not only to great works of art but also to more modest works of the past which have acquired cultural significance with the passing of time.

ARTICLE 2    The conservation and restoration of monuments must have recourse to all the sciences and techniques which can contribute to the study and safeguarding of the architectural heritage.

ARTICLE 3    The intention in conserving and restoring monuments is to safeguard them no less as works of art than as historical evidence.

ARTICLE 4    It is essential to the conservation of monuments that they be maintained on a permanent basis.

ARTICLE 5    The conservation of monuments is always facilitated by making use of them for some socially useful purpose.  Such use is therefore desirable but it must not change the lay-out or decoration of the building.  It is within these limits only that modifications demanded by a change of function should be envisaged and may be permitted.

ARTICLE 6    The conservation of a monument implies preserving a setting which is not out of scale.  Wherever the traditional setting exists, it must be kept.  No new construction, demolition or modification which would alter the relations of mass and colour must be allowed.

ARTICLE 7    A monument is inseparable from the history to which it bears witness and from the setting in which it occurs.  The moving of all or part of a monument cannot be allowed except where the safeguarding of that monument demands it or where it is justified by national or international interest of paramount importance.

ARTICLE 8    Items of sculpture, painting or decoration which form an integral part of a monument may only be removed from it if this is the sole means of ensuring their preservation.

ARTICLE 9    The process of restoration is a highly specialized operation.  Its aim is to preserve and reveal the aesthetic and historic value of the monument and is based on respect for original material and authentic documents.  It must stop at the point where conjecture begins, and in this case moreover any extra work which is indispensable must be distinct from the architectural composition and must bear a contemporary stamp.  The restoration in any case must be preceded and followed by an archaeological and historical study of the monument.

ARTICLE 10    Where traditional techniques prove inadequate, the consolidation of a monument can be achieved by the use of any modem technique for conservation and construction, the efficacy of which has been shown by scientific data and proved by experience.

ARTICLE 11    The valid contributions of all periods to the building of a monument must be respected, since unity of style is not the aim of a restoration.  When a building includes the superimposed work of different periods, the revealing of the underlying state can only be justified in exceptional circumstances and when what is removed is of little interest and the material which is brought to light is of great historical, archaeological or aesthetic value, and its state of preservation good enough to justify the action.  Evaluation of the importance of the elements involved and the decision as to what may be destroyed cannot rest solely on the individual in charge of the work.

ARTICLE 12    Replacements of missing parts must integrate harmoniously with the whole, but at the same time must be distinguishable from the original so that restoration does not falsify the artistic or historic evidence.

ARTICLE 13    Additions cannot be allowed except in so far as they do not detract from the interesting parts of the building, its traditional setting, the balance of its composition and its relation with its surroundings.

ARTICLE 14    The sites of monuments must be the object of special care in order to safeguard their integrity and ensure that they are cleared and presented in a seemly manner.  The work of conservation and restoration carried out in such places should be inspired by the principles set forth in the foregoing articles.

ARTICLE 15    Excavations should be carried out in accordance with scientific standards and the recommendation defining international principles to be applied in the case of archaeological excavation adopted by UNESCO in 1956.

Ruins must be maintained and measures necessary for the permanent conservation and protection of architectural features and of objects discovered must be taken.  Furthermore, every means must be taken to facilitate the understanding of the monument and to reveal it without ever distorting its meaning.

All reconstruction work should however be ruled out ‘a priori’.  Only anastylosis, that is to say, the reassembling of existing but dismembered parts can be permitted.  The material used for integration should always be recognizable and its use should be the least that will ensure the conservation of a monument and the reinstatement of its form.

ARTICLE 16    In all works of preservation, restoration or excavation, there should always be precise documentation in the form of analytical and critical reports, illustrated with drawings and photographs.  Every stage of the work of clearing, consolidation, rearrangement and integration, as well as technical and formal features identified during the course of the work, should be included.  This record should be placed in the archives of a public institution and made available to research workers.  It is recommended that the report should be published.

.

Note on BER Certificates for Historical Buildings in Ireland

Unless and until that magnificent marketing and public relations firm … Energy Ireland (SEAI) … can openly show that the DEAP Software has been properly modified to handle buildings of historical, architectural or cultural importance … and this modification is fully transparent … Building Energy Rating (BER) Certification for these building types must be put on hold.

.

.

END

Enhanced by Zemanta

Human Rights Must Have ‘Real’ Meaning in a Civilized Society !

2009-10-07:  As previously discussed … but deserving much repetition … the 2006 United Nations Convention on the Rights of Persons with Disabilities (CRPD) became an International Legal Instrument, i.e. entered into force, on 3rd May 2008.

This UN Convention simply aims to ensure that persons with disabilities are able to access human rights on the same basis as everyone else in society.  And rights are no more than an elaboration of the responsible basic needs of all human beings.

It is worth recalling that the 1948 Universal Declaration of Human Rights was directly born out of the large-scale death, human misery and environmental destruction of the Second World War in Europe, North Africa, the Middle-East … and throughout Asia and the Pacific.

Human Rights must have – do have – ‘real’ meaning in a civilized society !

.

Israel signed the UN Disability Rights Convention on 30th March 2007.  At the time of writing, it has not yet signed the Convention’s Optional Protocol.  Israel has definitely not ratified the Convention or the Optional Protocol.

[To be fair, Ireland is in exactly the same position as Israel.  Why am I not surprised ?!?]

With regard to Situations of Risk, e.g. a fire emergency in a building … or Humanitarian Emergencies, e.g. the Gaza Conflict from December 2008 to January 2009 … the language of Article 11 in the UN Convention is very clear and straightforward:

States Parties shall take, in accordance with their obligations under international law, including international humanitarian law and international human rights law, all necessary measures to ensure the protection and safety of persons with disabilities in situations of risk, including situations of armed conflict, humanitarian emergencies and the occurrence of natural disasters.”

On 3rd April 2009, the President of the UN Human Rights Council established the United Nations Fact Finding Mission on the Gaza Conflict with the mandate “to investigate all violations of international human rights law and international humanitarian law that might have been committed at any time in the context of the military operations that were conducted in Gaza during the period from 27 December 2008 and 18 January 2009, whether before, during or after.”

The President appointed Justice Richard Goldstone, former judge of the Constitutional Court of South Africa and former Prosecutor of the International Criminal Tribunals for the former Yugoslavia and Rwanda, to head the Mission.  The other three appointed members were:

  • Professor Christine Chinkin, Professor of International Law at the London School of Economics and Political Science, who was a member of the high-level fact finding mission to Beit Hanoun (2008) ;
  • Ms. Hina Jilani, Advocate of the Supreme Court of Pakistan and former Special Representative of the Secretary-General on the situation of human rights defenders, who was a member of the International Commission of Inquiry on Darfur (2004) ;   and
  • Colonel Desmond Travers, a former Officer in Ireland’s Defence Forces and member of the Board of Directors of the Institute for International Criminal Investigations.

.

The Report of the Fact Finding Mission on the Gaza Conflict was presented to the Human Rights Council, in Geneva (Switzerland), on 29th September 2009.

The following is a short extract from that Report

Section A – XVII  The Impact of the Blockade and of the Military Operations on the People of Gaza and their Human Rights

Persons with Disabilities (Paragraphs 1283-1291)

1283   Information provided to the Mission showed that many of those who were injured during the Israeli military operations sustained permanent disabilities owing to the severity of their injuries and/or the lack of adequate and timely medical attention and rehabilitation.  Gaza hospitals reportedly had to discharge patients too early so as to handle incoming emergencies.  Other cases resulted in amputations or disfigurement.  About 30 per cent of patients were expected to have long-term disabilities.

1284   WHO reported that by mid-April 2009 the number of people with different types of permanent disability (e.g. brain injuries, amputations, spinal injuries, hearing deficiencies, mental health problems) as a result of the military operations was not yet known.  It reported speculations that there might be some 1000 amputees; but information provided by the WHO office in Gaza and based on estimates by Handicap International indicated that around 200 persons underwent amputations.

1285   While the exact number of people who will suffer permanent disabilities is still unknown, the Mission understands that many persons who sustained traumatic injuries during the conflict still face the risk of permanent disability owing to complications and inadequate follow-up and physical rehabilitation.

1286   The Mission also heard moving accounts of families with disabled relatives whose disability had slowed their evacuation from a dangerous area or who lived with a constant fear that, in an emergency, their families would have to leave them behind because it would be too difficult to evacuate them.

1287   One testimony concerned a person whose electric wheelchair was lost after his house was targeted and destroyed.  Since the residents were given very short notice of the impending attack, the wheelchair could not be salvaged and the person had to be taken to safety on a plastic chair carried by four people.

1288   The Mission also heard a testimony concerning a pregnant woman who was instructed by an Israeli soldier to evacuate her home with her children, but to leave behind a mentally disabled child, which she refused to do.

1289   Even in the relative safety of shelters, people with disabilities continued to be exposed to additional hardship, as these shelters were not equipped for their special needs.  The Mission heard of the case of a person with a hearing disability who was sheltering in an UNRWA school, but was unable to communicate in sign language or understand what was happening and experienced sheer fear.

1290   Frequent disruptions in the power supply had a severe impact on the medical equipment needed by many people with disabilities.  People using wheelchairs had to face additional hurdles when streets started piling up with the rubble from destroyed buildings and infrastructure.

1291   In addition, programmes for people with disabilities had to be closed down during the military operations and rehabilitation services stopped (for instance, organizations providing assistance were unable to access stocks of wheelchairs and other aids).  Many social, educational, medical and psychological programmes have not yet fully resumed.

.

.

END

Enhanced by Zemanta

No Budgetary Control at FÁS – What About Technical Controls ?

2009-09-12:  Headlines in Ireland’s News Media, very recently, have concerned a lack of proper budgetary control … make that ‘any’ budgetary control … in FÁS (Foras Áiseanna Saothair) – the Irish Training & Employment Authority.

FÁS operates under the aegis of the Department of Enterprise, Trade and Employment and has functions in relation to the training of people with disabilities and the unemployed, the up-skilling of the employed and the administration of apprenticeships.

Special Report No.66 (dated 12th June 2009), from the Office of the Comptroller & Auditor General in Ireland, examined:

  • advertising and promotional expenditure by FÁS in the period 2002-2008 ;
  • budgetary control over FÁS’s advertising and promotional expenditure ;
  • general strategy under which advertising and promotional expenditure was spent in FÁS ;
  • the extent to which the effectiveness of this expenditure was evaluated ;
  • procurement of advertising and related services in FÁS.

Overall Examination Findings

Advertising, which accounted for almost half of the overall promotion expenditure by FÁS, is the largest in the non-commercial State sector.  The examination found that

  • Advertising and promotional activities lacked strategic direction insofar as a marketing and communications strategy had not been developed by FÁS despite longstanding commitments to do so.
  • There was a substantial and prolonged breakdown in budgetary control in the area of promotional expenditure in the period under review with expenditure exceeding budgets by 38%.  This lack of control was particularly evident in the area of general advertising where expenditure exceeded budgets by 66% over the seven-year period.
  • Much of the advertising was ineffective in increasing an awareness of the services provided by FÁS.
  • There was nugatory expenditure of €622,000 as a result of a series of transactions for which there was no evidence of goods or services having been provided.
  • There was also considerable non-effective expenditure including over €600,000 spent on producing TV advertisements that were not broadcast and payment of €9,200 for a car that was not delivered.
  • The rates FÁS paid for advertising were reasonably in line with industry norms.

Internal financial control was insufficient to ensure that all commitments were recorded and captured, and that procurement was conducted in accordance with public service norms and within expenditure authorisation limits.  In particular, the examination found that 

  • Commitment controls did not function when agents were used to effect transactions.  Procurement of certain goods and services by Corporate Affairs through contracted agencies meant that the Finance section only became aware of certain commitments when invoices were presented for payment.
  • FÁS was exposed to probity risks through a failure to meet public sector procurement requirements.  Exposures arose from the purchase from contracted agencies of goods and services that were not contemplated within the scope of their contracts and the potential consequences of FÁS playing a role in the selection of third parties by the agencies to provide services.
  • Expenditure authorisation limits were circumvented through the splitting of payment claims into a series of invoices.
  • There was a lack of clear accounting trails in regard to proceeds from the sale of exhibition space.

.

Why has it taken so long for this Report to enter the public domain ?

And … if there was no proper/any budgetary control in FÁS … is it reasonable to surmise that there were no proper/any technical controls either ?

  • In reality … how well trained were apprentices ?   When the construction industry started to go ‘wallop’ in Ireland, and our economy then nose dived into the ground, what happened to those apprentices … and where are they now ?
  • How well trained were people with disabilities ?   Did they get a fair deal ?   What was the quality of their employment, after the FÁS training ?   Are they still employed ?
  • How good/effective were FÁS’s training courses dealing with, e.g. ‘safety on construction sites’, or ‘radon protection of buildings’, etc ?   Was it a case of jobs for the ‘boys’ ?

.

.

END

Enhanced by Zemanta

Local Adaptation to Climate Change – Urgent ?

2009-07-11:  Why are people surprised at the damaging impacts of recent heavy rainfalls in Ireland ?

Hardly a building or a road has been designed in this country for deluge rainfalls.

Existing building and road design practices are no longer adequate.

When, therefore, will any urgency be given to ADAPTATION ???

 

Built Environment Adaptation to Climate Change

Reliably implementing policies, practices, projects and institutional reforms with the aim of reducing the adverse impacts and/or realizing the benefits directly/indirectly associated with climate change, including variability and extremes – in a manner which is compatible with sustainable human and social development.

.

.

END

Enhanced by Zemanta

Shell BP (Ireland) Ltd – Are They Having A Good Laugh At Us ?

2009-07-11:  There is something really rotten in the State of Mayo !   It looks bad, it smells bad, it tastes bad … and it is bad … on so many levels.

Is Shell BP just having a good laugh at us all in Ireland ?

.

.

END

Enhanced by Zemanta

National Disability Authority – 2nd Time Unlucky with Evacuation ?

2009-06-16:  Further to one of our first posts, dated 12th December 2008 (or 2008-12-12 !), concerning the National Disability Authority’s 2008 Publication: ‘Promoting Safe Egress and Evacuation for People with Disabilities’

On 15th April 2009 … we were circulated by Mr. Shane Hogan (NDA), in a general e-mail communication which was not addressed to us … with a Proposed 2nd Draft of the Evacuation Document.  Comments on this 2nd Draft were requested.

So … here are our comments …

1.  We repeat the earlier statement that ‘the document has many technical errors’.  It is clear that the National Disability Authority does not possess the requisite technical competence to oversee the proper development of such a publication.

Furthermore … many of the inadequate, flawed and discriminatory practices in relation to Fire Safety, Protection and Evacuation for All which have originated in Britain over many years … and are described yet again and most recently in BS 9999:2008 – Code of Practice for Fire Safety in the Design, Management and Use of Buildings (see previous post) … are just mindlessly regurgitated in the NDA Publication.

2.  We very much believe in, and are promoters of, Open Content on the Internet.  For that reason, SDI’s Copyright Guidelines are quite liberal.  And … although we do reserve all rights … we also state that …

‘ Reproduction by others of content produced and/or developed by Sustainable Design International Limited is permitted, except for commercial purposes, provided the source is acknowledged.’

It is clearly shown in the NDA’s 2nd Draft that copyright material developed by FireOx International (the Fire Engineering Division of Sustainable Design International Ltd.) was used, and abused, by White Young Green Consultants (Ireland) in the original 2008 NDA Publication.

We do not wish technical terms to be altered  … or our material to be linked directly with BS 8300:2009 – Design of Buildings and Their Approaches to Meet the Needs of Disabled People … and BS 9999:2008.  Please re-read our previous post !

White Young Green Consultants (Ireland) gained commercially from the use of our copyright material.  They did not inform us … nor did they request any permission from us … prior to that use.

Our material has been used again in the NDA’s 2nd Draft … and still nobody has bothered to seek our permission … for or about anything !

In order to at least appear to be acting ethically … perhaps somebody in the NDA, e.g. Ms. Mary Van Lieshout, Mr. Shane Hogan, Dr. Gerald Craddock or Ms. Angela Kerins might care to communicate directly with us now.

Finally, our private thoughts and feelings with regard to the actions of White Young Green Consultants (Ireland) shall remain just that … private !

Perhaps, however, White Young Green Consultants (Ireland) might cover the costs involved in consulting with our team of legal advisors.

.

.

END

Enhanced by Zemanta

BS 9999:2008 & BS 8300:2009 – Sleepwalking into Problems ?

2009-06-14:  Ireland has no national standards or codes of practice of its own covering Building Accessibility or Fire Safety in Buildings.  Instead, many people and organizations in this country will just switch to automatic pilot and  – without thinking or questioning – adopt the following two standards of another jurisdiction as the default Irish National Standards …

British Standard BS 9999:2008 – Code of Practice for Fire Safety in the Design, Management and Use of Buildings … was published on 31 October 2008.

British Standard BS 8300:2009 – Design of Buildings and Their Approaches to Meet the Needs of Disabled People.  This Code of Practice was published on 28 February 2009.

If Ireland does not quickly open its eyes … we will be sleep walking into a very problematic legal environment, as far as building accessibility and fire safety in buildings is concerned.

1.   An Immediate Challenge 

A Sub-Group (established at a meeting of the NSAI Accessibility-for-All Standards Consultative Committee WG1 held on Tuesday 2009-05-19) was tasked with developing a common position, suitable for application in Ireland and compatible with European Technical Harmonization, on the following issues:

  • Clear Width of Internal & External Door Openings ;
  • Turning Circles for Occupied Wheelchairs ;
  • Car Parking Spaces ;
  • Fire Safety Issues.

A series of coherent proposals will be presented to the next NSAI AASCC WG1 Meeting, on Friday 19th June 2009 … and, given the absence of Irish National Standards, it will also be suggested how these proposals may be confirmed as best current practice here.

.

2.   Overview of BS 8300:2009 & BS 9999:2008

During the development of the Draft ISO Accessibility-for-All Standard, it has been unanimously agreed that Accessibility encompasses the full range of activity related to buildings: to approach, enter, use, egress from and evacuate a building independently, in an equitable and dignified manner (Introduction, 2nd Paragraph, Page 5).  ‘Egress’ under normal, ambient conditions is distinguished from ‘Evacuation’ in the event of a fire emergency.  Use of the word ‘Escape’ is discouraged in any circumstance.  For the first time, fire safety texts have been fully incorporated into the main body of the Draft ISO Standard.

Accessibility within the British Standards Institution (BSI), on the other hand, is still segregated between BS 8300:2009 – approach, entry and use and BS 9999:2008 – fire evacuation.  Conflicts and gaps in content naturally result from such a configuration, which can now be seen as outdated and fundamentally flawed.

This configuration has been replicated, in Irish Building Regulations, with the separate scopes of Part M / Technical Guidance Document M and Part B / Technical Guidance Document B.  Integration between these 2 Technical Guidance Documents is very poor.  In practice, fire safety for people with activity limitations is widely disregarded within the process of Fire Safety Certification in Ireland.

2.1  BS 8300:2009

BSI has arrogantly gone on a solo run, and decided to deviate from some very widely accepted concepts of accessibility, e.g. ‘clear width’ of a door opening (discussed in more detail later).  The ‘Ergonomic Research’ supporting door opening forces of 30 N is at complete variance with earlier research in Britain and must, therefore, be strongly questioned.  Perhaps, it is the case that the Fire Services in England & Wales re-asserted their authority, supported by reference to European Fire Product Standards with little if any input from the European Disability Sector, and insisted on a ‘definite’, i.e. high, closing force being exerted on the door leaves in fire resisting doorsets.

2.2  BS 9999:2008

People with disabilities have a right, recognized in international law after 3rd May 2008, to equal opportunity and non-discrimination in matters of building fire safety, protection and evacuation.  A minimum response to Article 11 (Situations of Risk) in the 2006 United Nations Convention on the Rights of Persons with Disabilities is required, therefore, from fire regulators and code writers.  Such a response is absent in British Standard BS 9999:2008.

A close examination of the fire safety texts relating to ‘disability’ in BS 9999:2008 shows that they have not been properly integrated into the ‘mainstream’ content.  In fact, much of the content from the replaced BS 5588:Part 8 has just been grafted onto BS 9999, with very little change or alteration from the first version of Part 8 published in 1988 !

Compare Figure G.1 on Page 360 of BS 9999:2008 … with … Figure 4 on Page 8 of BS 5588:Part 8:1988 … both are exactly the same …

Black and white drawing showing both a token and an inadequate 'area of rescue assistance' in BS 9999:2008 - exactly as shown in the first version of BS 5588:Part 8 published back in 1988 !
Black and white drawing showing both a token and an inadequate ‘area of rescue assistance’ in BS 9999:2008 – exactly as shown in the first version of BS 5588:Part 8 published back in 1988 ! Click to enlarge.

Two Critical Observations in relation to the ‘area of rescue assistance’ shown above:

–  This drawing in BS 9999:2008 is in direct conflict with the text located directly above it … ‘where the wheelchair space is within a protected stairway, access to the wheelchair space should not obstruct the flow of persons escaping’ ;

but, more importantly …

–  In BS 9999:2008, fire safety for people with activity limitations receives treatment which is superficial and merely token.  Many times in relation to buildings generally, it is stated in Annex G.1, Page 359 …

‘A refuge needs to be of sufficient size both to accommodate a wheelchair and to allow the user to manoeuvre into the wheelchair space without undue difficulty.’

‘ In most premises, it is considered reasonable to have refuges of a size where each one is able to accommodate one wheelchair user.  Where it is reasonably foreseeable that the proportion of disabled users in a building will be relatively high, or where the use of the premises is likely to result in groups of wheelchair users being present (e.g. some types of sporting, entertainment, transport or public assembly buildings), consideration should be given to increasing the size and/or number of refuges accordingly.’

‘ NOTE 3   Managers of sporting or other venues where a number of disabled people might be present are advised not to restrict the number of disabled people who can be admitted to that venue on the grounds of the size of refuges, since some disabled people who use mobility aids such as a wheelchair will be able to self-evacuate in the case of a real fire.’

and again in Annex G.2.2 on Page 367 …

‘Where it is reasonably foreseeable that the refuges will be used by more than one user (e.g. some types of sporting, entertainment, transport or public assembly buildings), … ‘

.

Within such an inadequate and token context, it is understandable that an unduly heavy reliance is placed on the practice of developing Personal Emergency Evacuation Plans (PEEPS) for individuals with activity limitations.  See Paragraph #46.7a) on Page 248, which states …

‘ By taking into account the individual needs of a person when preparing a PEEP, management will be able to make any reasonable adjustments to the premises or procedures that are necessary.’

These Plans are flawed and discriminatory because they are:

–  person specific ;  and

–  location specific ;

… with the underlying assumption in the text being that, beyond the specified location(s), the building is not properly accessible, i.e. does not meet the functional requirements of Parts B & M in the Building Regulations for England & Wales – or, in the case of Ireland, Parts B & M of our Building Regulations.

.

There are silly technical errors in BS 9999:2008, e.g. in Annex G.2.3 on Page 368, it states …

‘Unless a different order has been agreed with the fire authority, evacuation should normally be in the following order:

1)     the fire floor ;

2)     the floor immediately above the fire floor ;  [This should read ‘the floors immediately above and immediately below the fire floor’ !]

3)     other floors above the fire floor starting at the top storey ;

4)     all remaining floors.’

.

A Technical Term is used in BS 9999:2008 – Place of Ultimate Safety – which complicates the already widely accepted term: ‘Place of Safety’.  The definition provided for the British Term in Section 3: Terms & Definitions (#3.84, Page 17) is so vague that it is of no practical use to fire engineering designers, building managers or building users.

.

3.   Comments:  i) Clear Width of Door Openings

Paragraph #6.4.1, on Page 36 of BS 8300:2009 introduces a new understanding of ‘clear width’ for door openings, which is illustrated in Figure 11 (Page 37) … and also a new term ‘effective clear width’.

The new understanding of ‘clear width’ is a complete departure from the standard understanding, widely accepted throughout the world, which is shown in the bottom left hand drawing of Figure 11.

The new term ‘effective clear width’ will complicate the already difficult concept of ‘clear width’.  Wasn’t the ‘clear width’ of a door opening always supposed to be ‘effective’, i.e. properly permit circulation for wheelchair users ?

However, the issue raised in the top right hand drawing of Figure 11 is valid …

Colour photograph showing the Final Fire Exit from a building (somewhere in Ireland). The 'clear width' of the door opening is seriously compromised - the door leaf cannot be fully opened and the panic bar reduces the 'clear width' still more.
Colour photograph showing the Final Fire Exit from a building (somewhere in Ireland). The ‘clear width’ of the door opening is seriously compromised – the door leaf cannot be fully opened and the panic bar reduces the ‘clear width’ still more.  Click to enlarge.

Solution:  Retain the current international/European/national understanding of ‘clear width’ for door openings in Ireland … but include text, with supporting drawings, in Revised Technical Guidance Documents B & M to ensure that there is no encroachment on that ‘clear width’ caused by protruding door leaf ironmongery or, more importantly, where the door leaf itself cannot be fully opened to 90o-100o.

.

4.   Comments:  i) Clear Width of Door Openings in Existing Buildings

Table 2, on Page 37 of BS 8300:2009, permits the ‘clear width’ for door openings in existing buildings to be reduced significantly below 800mm.

If buildings of historical, architectural and cultural importance are properly identified, and proper allowance is made for these specific building types in Revised Technical Guidance Documents B & M … there is no need to permit a general reduction in the ‘clear width’ for door openings in existing buildings.

Solution:  Clearly indicate in the Revised Technical Guidance Document M that the last ‘Existing Buildings’ Column on the right of Table 2 in BS 8300 should be disregarded.

.

5.   Comments:  ii) Turning Circles for Occupied Wheelchairs

Down through the years, it has been just possible to communicate the concept of the ‘wheelchair turning circle’ to building designers and urban planners … whether it be the older 1.5m diameter circle or the newer 1.8m diameter circle.

The new Figures and Tables in Annexes C.3 and C.4 of BS 8300:2009 will be difficult to communicate … and may be a complication too far ?

.

6.   Comments:  iv) Fire Safety Issues

Colour photograph showing people trapped at the top of one of the WTC Towers. This Tower collapsed soon afterwards.
Colour photograph showing people trapped at the top of one of the WTC Towers.  This Tower collapsed soon afterwards.   Click to enlarge.

The Recommendations contained in the 2005 & 2008 National Institute of Standards & Technology (USA) Reports on the WTC 9-11 Incident in New York provide an invaluable and essential empirical basis for the practice of effective fire engineering design in today’s built environment.

The first of these two reports has special relevance for NSAI AASCC WG1 because the typical problems encountered by people with activity limitations during a ‘real’ building fire incident have been highlighted by NIST and closely investigated.  As a result, three important fire engineering keywords have been re-stated with strong emphasis: ‘reality’ – ‘reliability’ – ‘redundancy’.  And, a new key phrase in relation to way finding during evacuation has been introduced to the everyday practice of fire engineering design: ‘intuitive and obvious’.

The 2005 NIST Report, particularly, must be given proper consideration during the development of any reputable fire safety related standard or code of practice for the following reasons:

–  at the time of the ‘real’ fire incident, approximately 8% of building users were people with disabilities, with 6% having mobility impairments ;  [The percentage of ‘building users with activity limitations’ exceeded the 8% quoted above.]

–  NIST found that the average surviving occupant in the buildings descended stairwells at about half the slowest speed previously measured for non-emergency/test evacuations.  This raises a serious question over the use of standard movement times in fire engineering design calculations for evacuation ;

–  NIST strongly recommended that fire-protected and structurally hardened lifts (elevators) should be installed in buildings to facilitate the evacuation of building users with disabilities, and to improve emergency response activities by providing timely emergency access to firefighters ;  [In Ireland, building designers have already adopted this approach by constructing cores of reinforced concrete … even in the absence of European/national standards.]

–  it was recommended that evacuation routes should have consistent layouts, and be ‘intuitive and obvious’ for all building users, including visitors who may be unfamiliar with the building, during evacuations ;

–  NIST recommended that staircase capacity and stair discharge door widths should be adequate to accommodate contraflow in circulation spaces, i.e. the simultaneous emergency access by firefighters into a building and towards a fire, while building users are still moving away from the fire and evacuating the building.  This has implications for the minimum clear width of all fire evacuation staircases.  Wider staircases facilitate the assisted evacuation and rescue of people with disabilities.

.

No consideration was given in BS 9999:2008, however, to any of the Recommendations contained in the 2005 & 2008 NIST Reports … there is not even a mention of either Report in the Bibliography (Pages 423-429).

–  For such an important national standard in Europe – BS 9999:2008 – there is no understanding demonstrated of the Fundamental Functional Requirement for Public Safety in Buildings …

Buildings shall remain structurally stable and serviceable …

1.  while people are waiting in ‘Areas of Rescue Assistance’ ;  and

2.  until all of these people can be rescued by Firefighters and can reach a ‘Place of Safety’, which is remote from a fire building – with an assurance of individual health, safety & welfare for the people involved ;

   –  There is a reference to ‘normal movement times’ which are used to calculate evacuation times in Mobility-Impaired People (Paragraph #46.2, Page 247), even though it was found by NIST that the average surviving occupant in the WTC Towers descended stairwells at about half the slowest speed previously measured for non-emergency evacuations.  In a ‘real’ fire incident, there is no such thing as ‘normal’ or ‘standard’ evacuation movement times, and the idea that any building must be clear of occupants within a very short timeframe, e.g. 2.5-3.5 minutes, is ludicrous ;

–  In the sensitive area of the Resistance to Damage of Enclosing and Separating Partitions (Paragraph #21.2.5 on Page 101) surrounding Firefighting Shafts, it is still permissible in BS 9999:2008 to use non-robust construction, e.g. lightweight plasterboard.  Fire-Induced Progressive Collapse is not discussed in the BS 9999 … and neither is Disproportionate Collapse, which is one of the functional requirements – A3 – in Part A of the Building Regulations for England & Wales (and Ireland !) ;

–  Although in Wheelchair Users (Paragraph #46.3 on Page 247), it is stated …

‘It should be noted that it can take as many as four people to use an evacuation chair safely and effectively.’

… the dimensions for the minimum width of staircases in Width of Escape Stairs (Table 14 on Page 88) and Firefighting Stairs (Paragraph #21.3.2 on Page 106) disregard the guidance given on Page 247 … and ignore the minimum clear staircase width (1.5m) required to safely assist the evacuation of a person in a manual wheelchair …

Black and white photograph (US FEMA 2002) showing the correct way to assist the fire evacuation of a wheelchair user in an evacuation staircase ... one person at each side, with another person behind.
Black and white photograph (US FEMA 2002) showing the correct way to assist the fire evacuation of a wheelchair user in an evacuation staircase … one person at each side, with another person behind.

And … for some unexplained reason, handrails are permitted to intrude into the ‘clear width’ of a firefighting staircase in BS 9999:2008 (Paragraph #21.3.2, Page 106).

Please note well … this method (shown below) of assisting the evacuation of a person in a manual wheelchair is NOT correct.  It is not possible to support any weight by holding the foot rests on a manual wheelchair, or by grasping the wheelchair by the front wheels …

Black & white sketch showing how definitely NOT to assist the fire evacuation of a wheelchair user in an evacuation staircase.
Black & white sketch showing how definitely NOT to assist the fire evacuation of a wheelchair user in an evacuation staircase.

Manual handling of occupied wheelchairs in a fire evacuation staircase, even with adequate training for everyone directly and indirectly involved, is hazardous for the person in the wheelchair and those people – minimum three – giving assistance.

The weight of an average unoccupied powered wheelchair, alone, makes manual handling impractical.  All lifts (elevators) in new buildings should, therefore, be capable of being used for evacuation in a fire situation.  Lifts (elevators) in existing buildings, when being replaced or undergoing a major overhaul, should then be made capable of use for this purpose.

.

Contraflow Circulation, i.e. the simultaneous emergency access by firefighters into a building and towards a fire, while building users are still moving away from the fire and evacuating the building, has not been considered at all in BS 9999:2008.

A clear staircase width of 1.5m provides sufficient space for a mobile person to evacuate (700 mm) and a heavily protected and equipped firefighter to simultaneously move in the opposite direction (800 mm) …

Colour drawing, with photograph insets, showing the symbiotic relationship between Contraflow Circulation and Proper Assisted Evacuation in a building.
Colour drawing, with photograph insets, showing the symbiotic relationship between Contraflow Circulation and Proper Assisted Evacuation in a building. Click to enlarge.

Human Behaviour in Fires should have been discussed in far more detail in BS 9999:2008 … but wasn’t.  It is important for fire engineering designers to understand that the ‘real’ people who use ‘real’ buildings every day of every week, in all parts of the world, have widely differing ranges of human abilities and activity limitations … they are different from each other, and they will react differently in a fire emergency.

Building users need to be Skilled for Evacuation to a place, or places, of safety remote from a fire building.  In the case of people with a mental or cognitive impairment, there is a particular need to encourage, foster and regularly practice the adaptive thinking which will be necessary during a ‘real’ fire evacuation.

Meaningful Consultation with every person known to occupy or use a building, for the purposes of receiving his/her active co-operation and obtaining his/her informed consent (involving a personal representative, if necessary), is an essential component of adequate pre-planning and preparation for a fire emergency.

Adequate Warning of a fire incident in a building should be communicated well in advance of the time when it is necessary to act and should continue for the full duration of the incident.  Warnings should be informative, and easily assimilated in a form (e.g. oral, written, braille) and language understood by the people using the building.

Panic attacks, during evacuation in a ‘real’ fire incident, exist.  The 2005 National Building Code of India refers extensively to this issue.

Solution:  To resolve the technical inadequacies, inconsistencies and content gaps in BS 9999:2008 … it will be necessary to revise Technical Guidance Document B in Ireland.  Fire safety, protection and evacuation from buildings for people with disabilities must be comprehensively included in the process of Fire Safety Certification.

.

7.        Conclusions – BS 9999:2008 & BS 8300:2009

There are many gaps and conflicts between these two British Standards, principally because … they are two separate standards … drafted by two different Technical Committees within the British Standards Institution (BSI).

Because of its deviation from widely accepted concepts of accessibility and its tortuous use of terminology, BS 8003:2009 will have an adverse impact on the practice of Accessibility Design in Ireland … and has already complicated the development of the ISO Accessibility-for-All Standard (DIS ISO 21542).

Arrogance within BSI is not the only reason for such deviations.  Distorting the European Union Single Market, for the purpose of introducing technical barriers to trade, is common in Britain … refer to the ‘deemed-to-satisfy’ status of the Approved Documents in the Building Regulations for England & Wales … and the Fire Protection Association’s ‘LPC Sprinkler Rules’.

Input from the Disability Sector during the drafting of BS 9999:2008 was not at all sufficient to ensure that there was a meaningful consideration of the problems encountered by people with activity limitations during a ‘real’ building fire incident.  The necessary range of available and effective fire engineering solutions has not, therefore, been presented in the standard.

In addition … the complete and abject failure to consider the important Recommendations contained in the 2005 & 2008 National Institute of Standards & Technology (USA) Reports on the WTC 9-11 Incident in New York was an inexcusable and unforgivable technical oversight.

The result is a crassly inadequate, discriminatory and deeply flawed national fire safety standard in Great Britain & Northern Ireland.  BS 9999:2008 became obsolete on the very day of its publication !

.

.

Postscript

Please refer to our 1999 Submission to the Department of the Environment & Local Government, in Dublin, concerning the use of British Standard BS 5588:Part 8 in Ireland …

http://www.sustainable-design.ie/arch/submissions.htm

Following this Submission, our understanding is that an ‘Internal’ Working Party was established within the Department.  However, the Working Party never reported.  No proper response to this Submission has ever been received from the Minister or the Department.

.

On 29th November 2006, similar and very polite comments were sent directly to the British Standards Institution (BSI) by e-mail.  Receipt of this e-mail was never acknowledged by anyone in BSI.

The contents of the e-mail were ignored.

.

.

END

Enhanced by Zemanta