After Grenfell: Reliable Design, Supply & Construction Essential !

2017-10-10:  After the Grenfell Tower Fire Tragedy in London, on 14 June 2017, the integrity of the English Regulatory and Technical/Building Control Systems is now so compromised that a complete Systems Transformation is immediately required !   Closer to home, here in Ireland … what nobody is daring to say, even our tame media, is that Our Regulatory System is based very closely on the English System.  And Our Technical/Building Control System is purposefully under-resourced … so it is weak and ineffective.

Let there be no confusion … Priory Hall and Longboat Quay, both in Dublin, are just the tip of an enormous iceberg …

Colour photograph showing the Grenfell Tower Fire, in London … early in the morning, after dawn, on Wednesday, 14 June 2017.  Harsh, tragic Reality !  Click to enlarge.

So where do we start again ?

Reality – Reliability – Redundancy – Resilience !

With regard to Reliable Fire Engineering Related Design, Supply and Construction … this is how we must proceed …

  1. Design of the works is exercised by an independent, appropriately qualified and experienced architect/engineer/fire engineer, with design competence relating to the fire protection of buildings ;
  1. Supply of fire safety related construction products/systems to the works is undertaken by reputable organizations with construction competence, particularly in relation to the fire protection of buildings ;
  1. Installation/fitting of fire safety related construction products/systems is exercised by appropriately qualified and experienced personnel, with construction competence relating to the fire protection of buildings ;
  1. Supervision of the works is exercised by appropriately qualified and experienced personnel from the principal construction organization ;
  1. Regular inspections, by appropriately qualified and experienced personnel familiar with the design, and independent of both the design and construction organizations, are carried out to verify that the works are being executed in accordance with the design.

.

.

END

LEED, PassivHaus & BREEAM Housing ~ Atrocious Fire Safety !!

2016-04-11:  It Happened One Night !

And Maybe … if it hadn’t been that particular night, during all the festivities of New Year’s Eve 2015, we would never have heard about the Address Supertall Hotel Fire, in Dubayy (UAE).  A long search on the Internet afterwards led to the detailed, post fire analysis report on the 2014 Lacrosse Docklands Fire, in Melbourne (Australia) … followed by some more searching, and a very large can of worms opened up … similar nasty façade (external fabric) fires in many, many countries … involving large chunks of flaming debris falling from terrific heights, carried by the wind to a significant distance away from the building of fire origin.

Click to enlarge.
Click to enlarge.

Some people have tried to suggest that the only reason for these fires is inadequate building codes/regulations.  No … the reason for these fires is much more than that … it’s the ‘SYSTEM’ !   In other words, how the International Construction Sector is organized and goes about its ordinary, everyday activities and tasks.  We must also talk about poor quality design and construction … and a lack of stringent, independent enforcement of effective building codes/regulations and standards.  I have written this down many times before … Self-Regulation is NO Regulation !!

It is very clear that Conventional Fire Engineering … as currently practiced, internationally … is no longer ‘fit for purpose’.  For discussion at SFE 2016 DUBLIN.  Check out the Fire Conference Website: www.sfe-fire.eu … and on Twitter: @sfe2016dublin

.

IN IRELAND … A 2015 TERRACED HOUSING FIRE …

The general public was shocked and stunned, to put it mildly, by a very rapid and extensive 2015 Terraced Housing Fire on the outskirts of Dublin …

Click to enlarge.
Click to enlarge.

[ See my Blog, dated 2011-04-06 … about a different, but related, 2011 Terraced Housing Fire in Terenure, a suburb of Dublin City.]

Click to enlarge.
Click to enlarge.

[ Fast forward from 2011 … overtaking Priory Hall (see my series of Blogs) … to Longboat Quay, a large residential development on the south bank of the River Liffey, which flows through the middle of Dublin.  A recent visual/surface inspection of one of the units there revealed not just a poor quality of construction … but a lack of care and attention, with a mixture of incompetence and ignorance thrown in for good measure.]

Click to enlarge.
Click to enlarge.

The 2015 Terraced Housing Fire, shown above, should not have been a surprise to the ‘System’ in Ireland.  Research carried out in the U.S.A., Belgium and The Netherlands since 2012, and a serious PassivHaus Apartment Fire in Köln, Germany, on the night of 5 February 2013  … have all shown that the modern home (highly insulated, airtight, packed with electronic equipment and wiring, and fast-burning synthetic furnishings, etc.) is the ‘perfect storm’ of fire conditions and outcomes.  More open residential design + increased fuel loads + new construction systems and materials = faster development of fires, much reduced times to flashover, far less time for occupant evacuation, particularly people with activity limitations … and shorter building collapse times.

The time to flashover in modern high-performance housing, i.e. Sustainable/Green/PassivHaus/Eco/LEED/Bio/+Energy/Low Carbon/BREEAM/Zero Carbon/SMART … can be 7 times faster than in conventional/legacy housing … or less than 5 minutes, compared with just over 29 minutes !

All of this research can be found on the Links & Docs Page of the SFE 2016 DUBLIN Website.

Let us be crystal clear … there is nothing Sustainable/Green/PassivHaus/Eco/LEED/Bio/+Energy/Low Carbon/BREEAM/Zero Carbon/SMART about the post-fire scenes of destruction shown above.  And only for the physical separation between terraces, which can be clearly seen in the last photograph … the fire would have kept spreading.

.

URGENT FIRE SAFETY RECOMMENDATIONS …

Without a balanced, proper approach to the issue of Fire Safety in this type of modern, high-performance housing … occupant safety is seriously threatened.  And if, in the event of a fire incident, the occupants are asleep … or people with activity limitations are living in the house … that threat will be extremely grave indeed.

Reality – Reliability – Redundancy – Resilience !

So … what needs to change ?   In Ireland, our immediate problem is Timber-Framed Housing (as shown above) … and the following is an outline of what must change … NOW !

  1. Party Walls, i.e. the walls separating one house from another, must be constructed of solid masonry, with a uniform and uncompromised thickness of at least 200mm … plastered on both sides, not dry-lined, for adequate smoke resistance … and be continued above the roof covering for at least 300mm.
  2. An effective Fire Detection System must be installed.  The conventional ‘package’ of one smoke detector per floor in the hallway and staircase of a standard 2 storey semi-detached house is nowhere near being adequate.
  3. An effective Residential / Domestic Fire Suppression System must be installed, e.g. low pressure water mist.  See later post, dated 2016-06-13, for a costed notional installation.
  4. If there is a Controlled Ventilation System, either mechanical or natural, in the house (for the purposes of air quality, heat exchange and energy conservation), it must be linked to the fire detection system.  In the event of a fire incident, the Ventilation System must immediately cease operation, and remain ‘fully open’.  This is in order to mitigate the build-up of high positive pressure, within a confined airtight space, caused by a developing fire … and to provide an exhaust route for smoke and toxic gases … during the short period of time prior to activation of the fire suppression system.
  5. Intermediate Timber Floors and Evacuation Routes, including fire resisting doorsets, must be reliably protected from fire and smoke.  The minimum period of fire and smoke resistance must be linked to local fire service support infrastructure.  In other words, the local fire services must be allowed sufficient time to arrive at the scene of a fire in strength … to search for any occupants still remaining in the fire building … and to bring the fire under control.
  6. Uppermost Ceilings under a trussed timber roof structure, including any trap doorsets into the roof space, must be similarly and reliably protected from fire and smoke.  Once fire enters a roof space, the light trussed timber structure will collapse within a few minutes.
  7. Front and Back Entrance/Egress Doors must be outward opening.  In the 2013 German PassivHaus Apartment Fire, the occupant found it extremely difficult to open inward opening doors and windows because of the high positive pressure caused by the developing fire.  This unusual phenomenon was confirmed in the 2015 Finnish Apartment Fire Tests, when much higher positive pressures were observed.
  8. Internal Linings of External Walls must comprise 2 layers of plasterboard, with all joints staggered … steel fixed, at not more than 150mm centres.  Once fire breaches the internal lining of an external wall, the whole building will become involved in the fire.  Horizontal and vertical fire sealing behind these linings, even if properly installed (!), are too little and too late.
  9. Frontline Firefighters must be supported by specialist structural engineering and hazard appraisal units … and light/portable/reliable Thermal Imaging Cameras must be recognized as a standard tool of firefighting.

.

SUSTAINABLE HOUSING & RESIDENTIAL BUILDINGS …

These building types are more popularly known as Green, PassivHaus / Passive House, LEED, Eco, Bio, BREEAM, +Energy, Zero / Low / Nearly Zero Carbon, or SMART, etc., etc, etc.   In ALL of these cases, however, an Effective Residential Fire Suppression System MUST BE INSTALLED, e.g. low pressure water mist !

In everyday practice … Authorities Having Jurisdiction (AHJ’s), and the Organizations and Individuals responsible for the far-too-rapid construction of these innovative building types are either completely and blissfully ignorant, or callously and negligently in denial, about the seriously negative impacts on Occupant & Firefighter Fire Safety and Building Fire Protection.

BUT … slowly … more and more reliable evidence is being gathered !   Please visit the Links & Docs Page on: www.sfe-fire.eu … and also view this Presentation on some very interesting 2015 Apartment Fire Tests in Finland: www.youtube.com/watch?v=0Ss_ONolzLY

.

ENERGY CONSERVATION & EFFICIENCY UPGRADING OF EXISTING BUILDINGS …

In refurbishment projects where insulation is fixed to the internal surfaces of external walls … similar fire safety problems exist, and they must be solved by reviewing the full checklist above.  Refer again to the PassivHaus Apartment Fire in Köln, Germany, on the night of 5 February 2013 … and to the 2015 Apartment Fire Tests in Finland

.

.

END

Defective Building Materials, Irish Pyrite & Chinese Plasterboard – FUBAR !

2014-07-08:  Why do individuals and institutions wake up to a problem only when extensive damage to property, or horrendous injury to people, has already occurred … and the shit hits the fan … big time ?!?   What way is that to organize a society … or protect its communities ???

The Answer is Simple:  Prevention !  Not Cure … when damage cannot be effectively repaired … some injuries can never be healed … and it becomes very costly to do anything !!

.

In Ireland … Part D of the Second Schedule to the Building Regulations, as amended, states the following …

Materials & Workmanship

Legal Requirement D1:  All works to which these Regulations apply shall be carried out with proper materials and in a workmanlike (i.e. competent) manner.

Definition of ‘Proper Materials’

Proper Materials:  Building/construction materials (or products, systems, assemblies, etc.) which are fit for the use for which they are intended and for the conditions/location in which they are to be used.

Reference European Union (EU) Legislation

EU Regulation No.305/2011 of the European Parliament and of the Council, of 9 March 2011, laying down harmonised conditions for the marketing of construction products and repealing Council Directive 89/106/EEC.

[ N.B. The 1989 European Directive on Construction Products (89/106/EEC) was repealed, in 2011, by Article 65 of EU Regulation No.305/2011. ]

.

THEREFORE …

It is the duty of a Supplier … any Supplier, e.g. manufacturer, distributor, agent, wholesaler, whatever … of building/construction materials to clearly show that they are ‘proper materials’, i.e. they are fit for the use for which they are intended and for the conditions/location in which they are to be used.

Refer to SDI’s Technical Guidance Noteswww.sustainable-design.ie/arch/tgn.htm

AND …

It is the duty of the Design Professional in Responsible Charge of a construction project (whoever he/she may be – architect, engineer, etc., etc.) to demand of a Supplier … additionally and most particularly, where there are any doubts about any relevant aspect of that material’s performance … that he/she/they clearly show that the building/construction materials they are supplying are ‘proper materials’, i.e. they are fit for the use for which they are intended and for the conditions/location in which they are to be used.

SO …

When Pyrite, for example, shows up in the hardcore under a finished concrete floor, or in the blockwork of a completed wall, in an Irish building … we know who has ignored his or her legal/professional duty concerning proper and satisfactory compliance with Legal Requirement D1 … and who is liable.

For bureaucrats and the legal profession, this is the end of the story.

BUT …

At this stage – when building occupants are hurt and extremely annoyed following, perhaps years, of inconvenience and discomfort – it’s too late !   The damage cannot be effectively repaired … and such limited repairs which can, in practical terms, be carried out will be very expensive.

PLAY IT AGAIN, SAM …

In Ireland, have we properly learned any lessons from Priory Hall, Pyrite, or Chinese Plasterboard ?   No !

Could these or similar problems occur AGAIN on an Irish building site ?   Yes !

Because … aided and abetted by the professional institutes … a ‘blind eye’ is being turned to the greatest lesson of all … that self-regulation/self-certification does NOT work !!

.

And Other E.U. Member States ???

The wording in national/local legislation may be slightly different … the language certainly will be different … but the legal intent is the same.

Legal/professional duties are similar.

Self-regulation/self-certification doesn’t work there either !

.

.

END