Reliable Fire Engineering Related Design Supply and Construction

After Grenfell: Reliable Design, Supply & Construction Essential !

2017-10-10:  After the Grenfell Tower Fire Tragedy in London, on 14 June 2017, the integrity of the English Regulatory and Technical/Building Control Systems is now so compromised that a complete Systems Transformation is immediately required !   Closer to home, here in Ireland … what nobody is daring to say, even our tame media, is that Our Regulatory System is based very closely on the English System.  And Our Technical/Building Control System is purposefully under-resourced … so it is weak and ineffective.

Let there be no confusion … Priory Hall and Longboat Quay, both in Dublin, are just the tip of an enormous iceberg …

Colour photograph showing the Grenfell Tower Fire, in London … early in the morning, after dawn, on Wednesday, 14 June 2017.  Harsh, tragic Reality !  Click to enlarge.

So where do we start again ?

Reality – Reliability – Redundancy – Resilience !

With regard to Reliable Fire Engineering Related Design, Supply and Construction … this is how we must proceed …

  1. Design of the works is exercised by an independent, appropriately qualified and experienced architect/engineer/fire engineer, with design competence relating to the fire protection of buildings ;
  1. Supply of fire safety related construction products/systems to the works is undertaken by reputable organizations with construction competence, particularly in relation to the fire protection of buildings ;
  1. Installation/fitting of fire safety related construction products/systems is exercised by appropriately qualified and experienced personnel, with construction competence relating to the fire protection of buildings ;
  1. Supervision of the works is exercised by appropriately qualified and experienced personnel from the principal construction organization ;
  1. Regular inspections, by appropriately qualified and experienced personnel familiar with the design, and independent of both the design and construction organizations, are carried out to verify that the works are being executed in accordance with the design.

.

.

END